Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0923-08339
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
3674 N PRINCE VILLAGE PL
Apply Date:
09/26/2023
Applicant:
TFS Solar
Description:
roof mount 5.33 kW DC photovoltaic solar system; 13 modules, 1 Tesla batteries with inverter with 2 strings, 50A breaker, 1 additional Tesla battery 30A breaker; 200A bus with 200A MCB and Tesla Backup Switch
Permit Reviews
Permit Number - TC-RES-0923-08339
Permit Status: Inspections complete
Permit Description: roof mount 5.33 kW DC photovoltaic solar system; 13 modules, 1 Tesla batteries with inverter with 2 strings, 50A breaker, 1 additional Tesla battery 30A breaker; 200A bus with 200A MCB and Tesla Backup Switch
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/27/2023 | RESIDENTIAL SOLAR v.1 | 10/13/2023 | APPROVED |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0923-08339
Permite Description: roof mount 5.33 kW DC photovoltaic solar system; 13 modules, 1 Tesla batteries with inverter with 2 strings, 50A breaker, 1 additional Tesla battery 30A breaker; 200A bus with 200A MCB and Tesla Backup Switch
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/18/2023 | BULD - Electrical Clearance | N/A | Partial Pass | 12/18/23 DGL for future solar |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0923-08339
Permit Description: roof mount 5.33 kW DC photovoltaic solar system; 13 modules, 1 Tesla batteries with inverter with 2 strings, 50A breaker, 1 additional Tesla battery 30A breaker; 200A bus with 200A MCB and Tesla Backup Switch
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/25/2024 | BULD - Electrical Clearance | Passed | Approved Tesla solar and battery installation, DGC/BAT Clearance to TEP is required | |
01/25/2024 | RSBU - Building Final | Passed | ||
01/25/2024 | COT - RSOL - Electrical Final Solar Project | Passed |