Permit: TC-RES-0923-08198
Permit Details
Status:
Approved
Type:
Residential Building - One or Two Family
Address:
413 S LA JOLLA AV UNIT 2
Address NEW:
413 S LA JOLLA AV UNIT 2
Apply Date:
09/20/2023
Applicant:
Jonathan Grimes
Description:
ADU Detached Guest House
Permit Reviews
Permit Number - TC-RES-0923-08198
Permit Status: Approved
Permit Description: ADU Detached Guest House
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/08/2025 | APPROVED |
| 09/25/2023 | RESIDENTIAL NEW DWELLING v.2 | 10/16/2023 | REQUIRES RESUBMIT |
| 09/22/2023 | RESIDENTIAL NEW DWELLING v.1 | 09/22/2023 | REQUIRES RESUBMIT |
| 02/09/2024 | RESIDENTIAL NEW DWELLING v.3 | 03/05/2024 | APPROVED |
| 01/02/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/02/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-RES-0923-08198
Permit Status: Approved
Permit Description: ADU Detached Guest House
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/21/2025 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor. |
Conditions
Permit Number - TC-RES-0923-08198
Permit Status: Approved
Permit Description: ADU Detached Guest House
| Date | Description | Comments |
|---|---|---|
| 09/25/2023 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 03/05/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/21/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/21/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 03/20/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Approved
Permit Number: TC-RES-0923-08198
Permite Description: ADU Detached Guest House
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/17/2024 | COT - RSBU - Interior Shear Bracing | N/A | Re-inspection required | 12-17-24, not ready-interior shear wall inspection will be checked after intermediates. |
Completed Inspections
Permit Status: Approved
Permit Number: TC-RES-0923-08198
Permit Description: ADU Detached Guest House
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/31/2024 | COT - RSPL - Sewer | Passed | ||
| 06/06/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 06/06/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Okay for concrete placement in footings and slab. 6/6/2024 | |
| 06/06/2024 | COT - RSBU - Preslab | Passed | ||
| 12/17/2024 | COT - RSBU - Roof Nailing | Passed | 12-17-24, roof nailing approved.Okay to continue construction . | |
| 01/02/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1/2/25 truss calculations on site, and to the correct schedule. Ok to proceed. | |
| 02/18/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to insulate and cover walls. | |
| 05/01/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 05/01/2025 | BULD - Electrical Clearance | Passed | Main house Unit #1, is service increase to 200 amps for new panel | |
| 03/24/2026 | COT - RSEL - Electrical Final | Passed | ||
| 09/18/2026 | COT - RSPL - Yard Water Line | Passed |