Permit Details

Status:
Approved
Type:
Residential Building - One or Two Family
Apply Date:
09/20/2023
Applicant:
Jonathan Grimes
Description:
ADU Detached Guest House

Permit Reviews

Permit Number - TC-RES-0923-08198
Permit Status: Approved
Permit Description: ADU Detached Guest House
Start Date Submittal Complete Date Status  
09/04/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/08/2025 APPROVED Review Details
09/25/2023 RESIDENTIAL NEW DWELLING v.2 10/16/2023 REQUIRES RESUBMIT Review Details
09/22/2023 RESIDENTIAL NEW DWELLING v.1 09/22/2023 REQUIRES RESUBMIT Review Details
02/09/2024 RESIDENTIAL NEW DWELLING v.3 03/05/2024 APPROVED Review Details
01/02/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/02/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-0923-08198
Permit Status: Approved
Permit Description: ADU Detached Guest House
Total Outstanding Activity Conditions - 1
Date Name
08/21/2025 Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor.

Conditions

Permit Number - TC-RES-0923-08198
Permit Status: Approved
Permit Description: ADU Detached Guest House
Date Description Comments
09/25/2023 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
03/05/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
08/21/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
08/21/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
03/20/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Approved
Permit Number: TC-RES-0923-08198
Permite Description: ADU Detached Guest House
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/17/2024 COT - RSBU - Interior Shear Bracing N/A Re-inspection required 12-17-24, not ready-interior shear wall inspection will be checked after intermediates.

Completed Inspections

Permit Status: Approved
Permit Number: TC-RES-0923-08198
Permit Description: ADU Detached Guest House
Total Completed Inspections - 11
Date Description Inspector Results Comments
05/31/2024 COT - RSPL - Sewer Passed
06/06/2024 COT - RSEL - Grounding/Bonding Passed
06/06/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Okay for concrete placement in footings and slab. 6/6/2024
06/06/2024 COT - RSBU - Preslab Passed
12/17/2024 COT - RSBU - Roof Nailing Passed 12-17-24, roof nailing approved.Okay to continue construction .
01/02/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 1/2/25 truss calculations on site, and to the correct schedule. Ok to proceed.
02/18/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Ok to insulate and cover walls.
05/01/2025 COT - RSEL - Electrical Underground Passed
05/01/2025 BULD - Electrical Clearance Passed Main house Unit #1, is service increase to 200 amps for new panel
03/24/2026 COT - RSEL - Electrical Final Passed
09/18/2026 COT - RSPL - Yard Water Line Passed

Documents

File Name Document Type  
R85479244.J2402873A (1)_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
OBA UPDATED_V1.PDF DOCUMENTS VIEW
413SLAJOLLAAVE_V1.PDF DOCUMENTS VIEW