Permit: TC-RES-0923-08165
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
10552 E CALLE POSTA QUEMADA
Address NEW:
10552 E CALLE POSTA QUEMADA
Apply Date:
09/19/2023
Applicant:
Alex Villanueva
Description:
Replace main service panel that was installed on 6/26/23 as part of solar installation under permit TC-RES-0423-04199. Main panel is faulty and caused burn out of PV breaker. No new solar components will be installed, just replacing the main service panel with another 225/200A panel.
Permit Reviews
Permit Number - TC-RES-0923-08165
Permit Status: Complete
Permit Description: Replace main service panel that was installed on 6/26/23 as part of solar installation under permit TC-RES-0423-04199. Main panel is faulty and caused burn out of PV breaker. No new solar components will be installed, just replacing the main service panel with another 225/200A panel.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/19/2023 | RESIDENTIAL SIMPLE REVIEW v.1 | 09/20/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0923-08165
Permit Status: Complete
Permit Description: Replace main service panel that was installed on 6/26/23 as part of solar installation under permit TC-RES-0423-04199. Main panel is faulty and caused burn out of PV breaker. No new solar components will be installed, just replacing the main service panel with another 225/200A panel.
| Date | Description | Comments |
|---|---|---|
| 09/19/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0923-08165
Permit Description: Replace main service panel that was installed on 6/26/23 as part of solar installation under permit TC-RES-0423-04199. Main panel is faulty and caused burn out of PV breaker. No new solar components will be installed, just replacing the main service panel with another 225/200A panel.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/20/2023 | BULD - Electrical Clearance | Passed | ||
| 10/20/2023 | COT - RSEL - Electrical Final | Passed |