Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
09/19/2023
Applicant:
Alex Villanueva
Description:
Replace main service panel that was installed on 6/26/23 as part of solar installation under permit TC-RES-0423-04199. Main panel is faulty and caused burn out of PV breaker. No new solar components will be installed, just replacing the main service panel with another 225/200A panel.

Permit Reviews

Permit Number - TC-RES-0923-08165
Permit Status: Complete
Permit Description: Replace main service panel that was installed on 6/26/23 as part of solar installation under permit TC-RES-0423-04199. Main panel is faulty and caused burn out of PV breaker. No new solar components will be installed, just replacing the main service panel with another 225/200A panel.
Start Date Submittal Complete Date Status  
09/19/2023 RESIDENTIAL SIMPLE REVIEW v.1 09/20/2023 APPROVED Review Details

Conditions

Permit Number - TC-RES-0923-08165
Permit Status: Complete
Permit Description: Replace main service panel that was installed on 6/26/23 as part of solar installation under permit TC-RES-0423-04199. Main panel is faulty and caused burn out of PV breaker. No new solar components will be installed, just replacing the main service panel with another 225/200A panel.
Date Description Comments
09/19/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0923-08165
Permit Description: Replace main service panel that was installed on 6/26/23 as part of solar installation under permit TC-RES-0423-04199. Main panel is faulty and caused burn out of PV breaker. No new solar components will be installed, just replacing the main service panel with another 225/200A panel.
Total Completed Inspections - 2
Date Description Inspector Results Comments
10/20/2023 BULD - Electrical Clearance Passed
10/20/2023 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
SITE PLAN RANSHAW_JAMES_V1.PDF DOCUMENTS VIEW