Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
09/19/2023
Applicant:
Bailey Randall
Description:
Roof Mounted PV system DC SYSTEM SIZE (kW): 10 kW / AC SYSTEM SIZE (kW): 7.25 kW with service upgrade to 200 A: REV 2: Include final inspections for Permit: T06BU00305. 25 modules

Permit Reviews

Permit Number - TC-RES-0923-08147
Permit Status: Inspections complete
Permit Description: Roof Mounted PV system DC SYSTEM SIZE (kW): 10 kW / AC SYSTEM SIZE (kW): 7.25 kW with service upgrade to 200 A: REV 2: Include final inspections for Permit: T06BU00305. 25 modules
Start Date Submittal Complete Date Status  
11/22/2023 RESIDENTIAL SOLAR v.1 12/06/2023 APPROVED Review Details
09/19/2023 RESIDENTIAL SOLAR v.1 09/29/2023 REQUIRES RESUBMIT Review Details
03/11/2024 RESIDENTIAL SOLAR v.1 03/21/2024 APPROVED Review Details
10/06/2023 RESIDENTIAL SOLAR v.2 10/12/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0923-08147
Permite Description: Roof Mounted PV system DC SYSTEM SIZE (kW): 10 kW / AC SYSTEM SIZE (kW): 7.25 kW with service upgrade to 200 A: REV 2: Include final inspections for Permit: T06BU00305. 25 modules
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/05/2024 BULD - Electrical Clearance N/A Partial Pass Partial for the 60A meter collar, DGL Clearance was called into TEP
Pending solar
04/23/2024 COT - RSOL - Grounding/Bonding Solar Project N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0923-08147
Permit Description: Roof Mounted PV system DC SYSTEM SIZE (kW): 10 kW / AC SYSTEM SIZE (kW): 7.25 kW with service upgrade to 200 A: REV 2: Include final inspections for Permit: T06BU00305. 25 modules
Total Completed Inspections - 5
Date Description Inspector Results Comments
04/16/2024 BULD - Electrical Clearance Passed Approved, DGC Clearance to TEP is required for the solar meter
04/16/2024 COT - RSOL - Electrical Final Solar Project Passed
04/16/2024 RSBU - Building Final Passed
04/23/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/23/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
216855_STRUCTURAL_ENGINEERING (1)_V1.PDF DOCUMENTS VIEW
CONS-216856_STRUCTURAL_ENGINEERING_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-201383_STRUCTURAL_ENGINEERING_V1.PDF DOCUMENTS VIEW
RESPONSE LETTER-TC-RES-0923-08147_V1.PDF DOCUMENTS VIEW
192210_STRUCTURAL_ENGINEERING_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-194513_STRUCTURAL_ENGINEERING (1)_V2.PDF DOCUMENTS VIEW
VSUN-400-108M-BB (6) COP COPY 15_V1.PDF DOCUMENTS VIEW