Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0923-08147
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1602 E CALLE SALAMANCA
Address NEW:
1602 E CALLE SALAMANCA
Apply Date:
09/19/2023
Applicant:
Bailey Randall
Description:
Roof Mounted PV system DC SYSTEM SIZE (kW): 10 kW / AC SYSTEM SIZE (kW): 7.25 kW with service upgrade to 200 A: REV 2: Include final inspections for Permit: T06BU00305. 25 modules
Permit Reviews
Permit Number - TC-RES-0923-08147
Permit Status: Complete
Permit Description: Roof Mounted PV system DC SYSTEM SIZE (kW): 10 kW / AC SYSTEM SIZE (kW): 7.25 kW with service upgrade to 200 A: REV 2: Include final inspections for Permit: T06BU00305.
25 modules
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/22/2023 | RESIDENTIAL SOLAR v.1 | 12/06/2023 | APPROVED |
| 09/19/2023 | RESIDENTIAL SOLAR v.1 | 09/29/2023 | REQUIRES RESUBMIT |
| 03/11/2024 | RESIDENTIAL SOLAR v.1 | 03/21/2024 | APPROVED |
| 10/06/2023 | RESIDENTIAL SOLAR v.2 | 10/12/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0923-08147
Permite Description: Roof Mounted PV system DC SYSTEM SIZE (kW): 10 kW / AC SYSTEM SIZE (kW): 7.25 kW with service upgrade to 200 A: REV 2: Include final inspections for Permit: T06BU00305.
25 modules
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/05/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the 60A meter collar, DGL Clearance was called into TEP Pending solar |
| 04/23/2024 | COT - RSOL - Grounding/Bonding Solar Project | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0923-08147
Permit Description: Roof Mounted PV system DC SYSTEM SIZE (kW): 10 kW / AC SYSTEM SIZE (kW): 7.25 kW with service upgrade to 200 A: REV 2: Include final inspections for Permit: T06BU00305.
25 modules
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/16/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter | |
| 04/16/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 04/16/2024 | RSBU - Building Final | Passed | ||
| 04/23/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 04/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |