Permit: TC-RES-0923-08133
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2151 N RAINBOW VISTA DR
Address NEW:
2151 N RAINBOW VISTA DR
Apply Date:
09/19/2023
Applicant:
Description:
install a 7.6 KW PV Solar system with 16 modules, 1 tesla inverter and 6 micro inverters
Permit Reviews
Permit Number - TC-RES-0923-08133
Permit Status: Complete
Permit Description: install a 7.6 KW PV Solar system with 16 modules, 1 tesla inverter and 6 micro inverters
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/03/2023 | RESIDENTIAL SOLAR v.2 | 10/09/2023 | APPROVED |
| 09/19/2023 | RESIDENTIAL SOLAR v.1 | 09/29/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0923-08133
Permit Status: Complete
Permit Description: install a 7.6 KW PV Solar system with 16 modules, 1 tesla inverter and 6 micro inverters
| Date | Description | Comments |
|---|---|---|
| 10/10/2023 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 10/10/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0923-08133
Permit Description: install a 7.6 KW PV Solar system with 16 modules, 1 tesla inverter and 6 micro inverters
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2023 | RSBU - Building Final | Passed | DGC to TEP approved | |
| 11/13/2023 | COT - RSOL - Electrical Final Solar Project | Passed | DGC to TEP approved | |
| 11/13/2023 | BULD - Electrical Clearance | Passed | DGC to TEP approved |