Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
09/15/2023
Applicant:
Albert Montoya
Description:
New Pool/ Spa Build

Permit Reviews

Permit Number - TC-RES-0923-08051
Permit Status: Issued
Permit Description: New Pool/ Spa Build
Start Date Submittal Complete Date Status  
09/18/2023 RESIDENTIAL NEW DWELLING v.1 09/18/2023 REQUIRES RESUBMIT Review Details
09/21/2023 RESTAMP - RESIDENTIAL v.1 09/22/2023 APPROVED Review Details
09/20/2023 RESIDENTIAL NEW DWELLING v.2 09/21/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-RES-0923-08051
Permite Description: New Pool/ Spa Build
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/20/2023 RSEL - Electrical Progress N/A Partial Pass Electrical rough-in of conduits is complete. okay to backfill trench.

Completed Inspections

Permit Status: Issued
Permit Number: TC-RES-0923-08051
Permit Description: New Pool/ Spa Build
Total Completed Inspections - 10
Date Description Inspector Results Comments
10/20/2023 Pool/Spa - Bonding Grip Passed Rebar reinforcement is properly installed with dobies holding up rebar off the ground. Ufer ground is installed around pool deck, attached at 4 locations and at the pool equipment. Water supply lines are installed from equipment to skimmer basket and bottom jets. Electrical conduit are ran from panel to pool equipment location. Gas line for pool heater and barbecue are properly installed. Okay to shade and backfill trenches for plumbing, gas, and electrical.
10/20/2023 Pool/Spa - Electric Passed Rebar reinforcement is properly installed with dobies holding up rebar off the ground. Ufer ground is installed around pool deck, attached at 4 locations and at the pool equipment. Water supply lines are installed from equipment to skimmer basket and bottom jets. Electrical conduit are ran from panel to pool equipment location. Gas line for pool heater and barbecue are properly installed. Okay to shade and backfill trenches for plumbing, gas, and electrical.
10/20/2023 Pool/Spa - Plumbing Passed Rebar reinforcement is properly installed with dobies holding up rebar off the ground. Ufer ground is installed around pool deck, attached at 4 locations and at the pool equipment. Water supply lines are installed from equipment to skimmer basket and bottom jets. Electrical conduit are ran from panel to pool equipment location. Gas line for pool heater and barbecue are properly installed. Okay to shade and backfill trenches for plumbing, gas, and electrical.
10/20/2023 Pool/Spa - Pre-Gunite Passed Rebar reinforcement is properly installed with dobies holding up rebar off the ground. Ufer ground is installed around pool deck, attached at 4 locations and at the pool equipment. Water supply lines are installed from equipment to skimmer basket and bottom jets. Electrical conduit are ran from panel to pool equipment location. Gas line for pool heater and barbecue are properly installed. Okay to shade and backfill trenches for plumbing, gas, and electrical.
10/20/2023 Pool/Spa - Gas Passed Rebar reinforcement is properly installed with dobies holding up rebar off the ground. Ufer ground is installed around pool deck, attached at 4 locations and at the pool equipment. Water supply lines are installed from equipment to skimmer basket and bottom jets. Electrical conduit are ran from panel to pool equipment location. Gas line for pool heater and barbecue are properly installed. Okay to shade and backfill trenches for plumbing, gas, and electrical.
03/07/2024 COT - BULD - SWG Clearance Passed
03/07/2024 Pool/Spa - Final/Barrier Passed
03/07/2024 RSEL - Electrical Progress Passed
03/08/2024 COT - RSEL - Electrical Final Passed
03/08/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
ABI-AAD, TOUFIC SITE PLAN II_V2.PDF DOCUMENTS VIEW
CONS-ABI-AAD CONSTRUCTION PLAN_V1.PDF DOCUMENTS VIEW