Permit: TC-RES-0923-07783
Permit Details
Apply Date:
09/05/2023
Applicant:
alex enoch
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0923-07783
Permit Status: In review
Permit Description: SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/16/2023 | RESTAMP - RESIDENTIAL v.1 | 11/16/2023 | APPROVED |
10/31/2023 | RESIDENTIAL NEW DWELLING v.2 | 11/16/2023 | APPROVED |
09/05/2023 | RESIDENTIAL NEW DWELLING v.1 | 09/29/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0923-07783
Permit Status: In review
Permit Description: SFR
Date | Description | Comments |
---|---|---|
11/16/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: In Review
Permit Number: TC-RES-0923-07783
Permite Description: SFR
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/18/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 12/18/23: footing reinforcements for column S3.0/3 calls for #4 rebar spaced at 8" O.C. Each way. (Min 3). All footings reinforcement over spaced. |
12/18/2023 | COT - RSBU - Preslab | N/A | Re-inspection required | 12/18/23: footing reinforcements for column S3.0/3 calls for #4 rebar spaced at 8" O.C. Each way. (Min 3). All footings reinforcement over spaced. |
Completed Inspections
Permit Status: In Review
Permit Number: TC-RES-0923-07783
Permit Description: SFR
Total Completed Inspections - 16
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/19/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
12/19/2023 | COT - RSBU - Preslab | Passed | ||
01/03/2024 | COT - RSEL - Electrical Underground | Passed | Electrical conduit is ran from Unit #1 to Unit #2. Unit #1 will have 2 electrical meters installed on the north side once exterior framing is complete. Okay to backfill electrical trench. | |
01/03/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is connected to main sewer line, with green tracer wire installed around pipe. Okay to shade pipes and backfill trenches. | |
01/03/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to main sewer line, with green tracer wire installed around pipe. Okay to shade pipes and backfill trenches. | |
01/03/2024 | COT - RSPL - Yard Water Line | Passed | Water line for both Units 1 & 2 are connected to one meter at this time, with blue tracer wire on each main water supply line. Okay to shade pipes and backfill trenches. | |
01/30/2024 | BULD - Electrical Clearance | Passed | Approved new 200A service panel, ECO Clearance to TEP is required for the construction power at unit #2 | |
03/05/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Ok to cover exterior walls. | |
03/05/2024 | COT - RSBU - Roof Nailing | Passed | Ok to dry-in roof system. | |
04/04/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to insulate and cover wall. | |
04/04/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
08/15/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
08/28/2024 | RSBU - Building Final | Passed | ||
08/28/2024 | COT - RSEL - Electrical Final | Passed | ||
08/28/2024 | COT - RSME - Mechanical Final | Passed | ||
08/28/2024 | COT - RSPL - Plumbing Final | Passed |