Permit: TC-RES-0923-07770
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
942 S FREMONT AV
Apply Date:
09/05/2023
Applicant:
TFS Solar
Description:
roof mount 9.84 kW DC photovoltaic solar system; 24 modules, 27 kWh storage system; 2 Tesla batteries with inverters with 2 strings each, 50A PV breaker each; 200A bus with 200A MCB and Tesla Backup Switch
Permit Reviews
Permit Number - TC-RES-0923-07770
Permit Status: Inspections complete
Permit Description: roof mount 9.84 kW DC photovoltaic solar system; 24 modules, 27 kWh storage system; 2 Tesla batteries with inverters with 2 strings each, 50A PV breaker each; 200A bus with 200A MCB and Tesla Backup Switch
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/05/2023 | RESIDENTIAL SOLAR v.1 | 09/29/2023 | APPROVED |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0923-07770
Permite Description: roof mount 9.84 kW DC photovoltaic solar system; 24 modules, 27 kWh storage system; 2 Tesla batteries with inverters with 2 strings each, 50A PV breaker each; 200A bus with 200A MCB and Tesla Backup Switch
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/03/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the Tesla meter collar, DGL Clearance was called into TEP |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0923-07770
Permit Description: roof mount 9.84 kW DC photovoltaic solar system; 24 modules, 27 kWh storage system; 2 Tesla batteries with inverters with 2 strings each, 50A PV breaker each; 200A bus with 200A MCB and Tesla Backup Switch
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/10/2024 | BULD - Electrical Clearance | Passed | Approved, DGC/BAT Clearance to TEP is required for the solar meter and battery installation | |
01/10/2024 | RSBU - Building Final | Passed | ||
01/10/2024 | COT - RSOL - Electrical Final Solar Project | Passed |