Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
942 S FREMONT AV
Apply Date:
09/05/2023
Applicant:
TFS Solar
Description:
roof mount 9.84 kW DC photovoltaic solar system; 24 modules, 27 kWh storage system; 2 Tesla batteries with inverters with 2 strings each, 50A PV breaker each; 200A bus with 200A MCB and Tesla Backup Switch

Permit Reviews

Permit Number - TC-RES-0923-07770
Permit Status: Inspections complete
Permit Description: roof mount 9.84 kW DC photovoltaic solar system; 24 modules, 27 kWh storage system; 2 Tesla batteries with inverters with 2 strings each, 50A PV breaker each; 200A bus with 200A MCB and Tesla Backup Switch
Start Date Submittal Complete Date Status  
09/05/2023 RESIDENTIAL SOLAR v.1 09/29/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0923-07770
Permite Description: roof mount 9.84 kW DC photovoltaic solar system; 24 modules, 27 kWh storage system; 2 Tesla batteries with inverters with 2 strings each, 50A PV breaker each; 200A bus with 200A MCB and Tesla Backup Switch
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/03/2024 BULD - Electrical Clearance N/A Partial Pass Partial for the Tesla meter collar, DGL Clearance was called into TEP

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0923-07770
Permit Description: roof mount 9.84 kW DC photovoltaic solar system; 24 modules, 27 kWh storage system; 2 Tesla batteries with inverters with 2 strings each, 50A PV breaker each; 200A bus with 200A MCB and Tesla Backup Switch
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/10/2024 BULD - Electrical Clearance Passed Approved, DGC/BAT Clearance to TEP is required for the solar meter and battery installation
01/10/2024 RSBU - Building Final Passed
01/10/2024 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-MANANDHAR, S. PV 9.84 KW STORAGE 27 KWH-DRAWINGS_V1.PDF DOCUMENTS VIEW
MANANDHAR, S. PV 9.84 KW STORAGE 27 KWH-SPECS_V1.PDF DOCUMENTS VIEW