Permit: TC-RES-0826-04611
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2533 N EDITH BL
Address NEW:
2533 N EDITH BL
Apply Date:
08/18/2026
Applicant:
Stephen Johnston
Description:
I will install a 100 amp all in one panel with a main 100 amp breaker and 16 to 24 spaces. I will install a new riser, weather head, point of attachment, brace kit with 2 5ft braces bolted to the roof and 1/0 aluminum feeder wire to supply up to 125 amps. I will then install 2 new 8ft 5/8 copper clad ground rods interconnected with 4 gauge copper ground wire and tied to the new panel. I'll also install new water and gas bonding interconnected together and tied to the the panel with #6 copper ground wire. I will install a 30 amp breaker to feed the interior panel and install any other breakers that are necessary for the apartment. I'll label the panel with a label maker and install a metal address label on the outside of the panel. I will seal any penetrations in the roof with a roofing jack and roofing sealant. Once power has been restored I will make sure that everything is working as it did before.
Permit Reviews
Permit Number - TC-RES-0826-04611
Permit Status: Complete
Permit Description: I will install a 100 amp all in one panel with a main 100 amp breaker and 16 to 24 spaces. I will install a new riser, weather head, point of attachment, brace kit with 2 5ft braces bolted to the roof and 1/0 aluminum feeder wire to supply up to 125 amps. I will then install 2 new 8ft 5/8 copper clad ground rods interconnected with 4 gauge copper ground wire and tied to the new panel. I'll also install new water and gas bonding interconnected together and tied to the the panel with #6 copper ground wire. I will install a 30 amp breaker to feed the interior panel and install any other breakers that are necessary for the apartment. I'll label the panel with a label maker and install a metal address label on the outside of the panel. I will seal any penetrations in the roof with a roofing jack and roofing sealant.
Once power has been restored I will make sure that everything is working as it did before.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/19/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 08/20/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0826-04611
Permit Status: Complete
Permit Description: I will install a 100 amp all in one panel with a main 100 amp breaker and 16 to 24 spaces. I will install a new riser, weather head, point of attachment, brace kit with 2 5ft braces bolted to the roof and 1/0 aluminum feeder wire to supply up to 125 amps. I will then install 2 new 8ft 5/8 copper clad ground rods interconnected with 4 gauge copper ground wire and tied to the new panel. I'll also install new water and gas bonding interconnected together and tied to the the panel with #6 copper ground wire. I will install a 30 amp breaker to feed the interior panel and install any other breakers that are necessary for the apartment. I'll label the panel with a label maker and install a metal address label on the outside of the panel. I will seal any penetrations in the roof with a roofing jack and roofing sealant.
Once power has been restored I will make sure that everything is working as it did before.
| Date | Description | Comments |
|---|---|---|
| 08/20/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0826-04611
Permit Description: I will install a 100 amp all in one panel with a main 100 amp breaker and 16 to 24 spaces. I will install a new riser, weather head, point of attachment, brace kit with 2 5ft braces bolted to the roof and 1/0 aluminum feeder wire to supply up to 125 amps. I will then install 2 new 8ft 5/8 copper clad ground rods interconnected with 4 gauge copper ground wire and tied to the new panel. I'll also install new water and gas bonding interconnected together and tied to the the panel with #6 copper ground wire. I will install a 30 amp breaker to feed the interior panel and install any other breakers that are necessary for the apartment. I'll label the panel with a label maker and install a metal address label on the outside of the panel. I will seal any penetrations in the roof with a roofing jack and roofing sealant.
Once power has been restored I will make sure that everything is working as it did before.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2026 | RSEL - Electrical Progress | Passed | ||
| 09/22/2026 | COT - RSEL - Electrical Final | Passed | ||
| 09/22/2026 | BULD - Electrical Clearance | Passed |