Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address NEW:
6953 E KIRKLAND DR
Apply Date:
08/10/2026
Applicant:
Project Manager
Description:
Installation of roof-mounted PV SYSTEM SIZE: DC SIZE : 14 X 405W=5.670 KW DC; AC SIZE : 1 X 11500W=11.500 KW AC; (14) LONGI LR5-54HPB-405M (405W) [BLK] MODULES; (1) TESLA POWERWALL 3 (MODEL NO- 1707000-60-M); (1) TESLA BACKUP SWITCH (MODEL NO -1624171-XX-Y); (1) 225A METER MAIN COMBO

Permit Reviews

Permit Number - TC-RES-0826-04417
Permit Status: Issued
Permit Description: Installation of roof-mounted PV SYSTEM SIZE: DC SIZE : 14 X 405W=5.670 KW DC; AC SIZE : 1 X 11500W=11.500 KW AC; (14) LONGI LR5-54HPB-405M (405W) [BLK] MODULES; (1) TESLA POWERWALL 3 (MODEL NO- 1707000-60-M); (1) TESLA BACKUP SWITCH (MODEL NO -1624171-XX-Y); (1) 225A METER MAIN COMBO
Start Date Submittal Complete Date Status  
08/10/2026 RESIDENTIAL SOLAR v.1 08/24/2026 REQUIRES RESUBMIT Review Details
09/16/2026 RESIDENTIAL SOLAR v.2 09/22/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-0826-04417
Permit Status: Issued
Permit Description: Installation of roof-mounted PV SYSTEM SIZE: DC SIZE : 14 X 405W=5.670 KW DC; AC SIZE : 1 X 11500W=11.500 KW AC; (14) LONGI LR5-54HPB-405M (405W) [BLK] MODULES; (1) TESLA POWERWALL 3 (MODEL NO- 1707000-60-M); (1) TESLA BACKUP SWITCH (MODEL NO -1624171-XX-Y); (1) 225A METER MAIN COMBO
Date Description Comments
09/22/2026 Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-MARGOT SHACKELFORD-PLANSET_REV1-09-12-2026-6953-KIRKLAND-DR_V2.PDF DOCUMENTS VIEW
MARGOT SHACKELFORD_RESPONSE LETTER-2026-09-15_V1.PDF DOCUMENTS VIEW