Permit: TC-RES-0826-04325
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
1224 E 31ST ST
Address NEW:
1224 E 31ST ST
Apply Date:
08/05/2026
Applicant:
Brittany Vasquez
Description:
Converting tub to shower - replacing tub with pan, drain, and valves.
Permit Reviews
Permit Number - TC-RES-0826-04325
Permit Status: Inspections complete
Permit Description: Converting tub to shower - replacing tub with pan, drain, and valves.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/10/2026 | RESIDENTIAL ADD/ALT v.1 | 08/21/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0826-04325
Permit Status: Inspections complete
Permit Description: Converting tub to shower - replacing tub with pan, drain, and valves.
| Date | Description | Comments |
|---|---|---|
| 08/21/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0826-04325
Permite Description: Converting tub to shower - replacing tub with pan, drain, and valves.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2026 | COT - RSPL - Rough Soil | N/A | Not Applicable | 9-23-26 Drainage pipe remains in the same place N/A |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0826-04325
Permit Description: Converting tub to shower - replacing tub with pan, drain, and valves.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 9-23-26 Approved. Verified pecks lines in wall, shower Pan under test OK to proceed | |
| 10/21/2026 | COT - RSPL - Plumbing Final | Passed | 10/21/26: plumbing final approved. |