Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address NEW:
3027 N SIBLEY MINE RD
Apply Date:
08/29/2025
Applicant:
Marytine Ramos
Description:
REV_1 Equipment relocation and equipment revision; Installation of 7.31 kW PV System with PW3 Battery

Permit Reviews

Permit Number - TC-RES-0825-04297
Permit Status: Inspections
Permit Description: REV_1 Equipment relocation and equipment revision; Installation of 7.31 kW PV System with PW3 Battery
Start Date Submittal Complete Date Status  
08/29/2025 RESIDENTIAL SOLAR v.1 09/25/2025 APPROVED Review Details
12/03/2025 RESIDENTIAL SOLAR REVISION v.1 12/15/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0825-04297
Permit Status: Inspections
Permit Description: REV_1 Equipment relocation and equipment revision; Installation of 7.31 kW PV System with PW3 Battery
Date Description Comments
09/26/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-0825-04297
Permit Description: REV_1 Equipment relocation and equipment revision; Installation of 7.31 kW PV System with PW3 Battery
Total Completed Inspections - 3
Date Description Inspector Results Comments
03/11/2026 BULD - Electrical Clearance Passed Partial pass 3/11/26 for Tesla switch CLEARANCE DGL
03/19/2026 RSBU - Building Final Passed pass CLEARANCE DGC/BAT
03/19/2026 COT - RSOL - Electrical Final Solar Project Passed pass CLEARANCE DGC/BAT

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-OUR96853-CONWAY_CAD 2_V1.PDF DOCUMENTS VIEW
REVISION LETTER - CHRISTINE CONWAY_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-OUR96853-CONWAY_CAD 1_V1.PDF DOCUMENTS VIEW