Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
2935 E 8TH ST
Address NEW:
2935 E 8TH ST
Apply Date:
08/26/2025
Applicant:
TFS Solar
Description:
Roof mount 12.18 kW DC photovoltaic solar system; 28 modules; 40.5 kWh Storage, 2 Tesla Powerwall-3 batteries with integrated PV inverter with 2 strings each. 1 battery expansion pack, (no inverter). 125A generation panel to solar meter. Fused disconnect for interconnection on 200A bus with 200A MCB, interconnection via PCS on existing panel lugs. Tesla Backup Switch for whole home backup.

Permit Reviews

Permit Number - TC-RES-0825-04227
Permit Status: Inspections
Permit Description: Roof mount 12.18 kW DC photovoltaic solar system; 28 modules; 40.5 kWh Storage, 2 Tesla Powerwall-3 batteries with integrated PV inverter with 2 strings each. 1 battery expansion pack, (no inverter). 125A generation panel to solar meter. Fused disconnect for interconnection on 200A bus with 200A MCB, interconnection via PCS on existing panel lugs. Tesla Backup Switch for whole home backup.
Start Date Submittal Complete Date Status  
08/26/2025 RESIDENTIAL SOLAR v.1 09/23/2025 APPROVED Review Details

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-0825-04227
Permit Description: Roof mount 12.18 kW DC photovoltaic solar system; 28 modules; 40.5 kWh Storage, 2 Tesla Powerwall-3 batteries with integrated PV inverter with 2 strings each. 1 battery expansion pack, (no inverter). 125A generation panel to solar meter. Fused disconnect for interconnection on 200A bus with 200A MCB, interconnection via PCS on existing panel lugs. Tesla Backup Switch for whole home backup.
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/31/2025 BULD - Electrical Clearance Passed Clearance for TEP DGC/DGL/BAT. 10/31/2025
10/31/2025 RSBU - Building Final Passed
10/31/2025 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SHEEHAN MICHAEL PV 12.18 KW STORAGE 40.5 KWH-DRAWINGS_V1.PDF DOCUMENTS VIEW
SHEEHAN MICHELE PV 12.18 KW STORAGE 40.5 KWH-SPECS_V1.PDF DOCUMENTS VIEW