Permit: TC-RES-0825-04108
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1725 S SAN ANTONIO DR UNIT 1
Address NEW:
1725 S SAN ANTONIO DR UNIT 1
Apply Date:
08/19/2025
Applicant:
Arturo Rojo
Description:
EDIT 09/30/2025: Connecting Unit 1 (the back residence) to the new sewer main
Permit Reviews
Permit Number - TC-RES-0825-04108
Permit Status: Complete
Permit Description: EDIT 09/30/2025: Connecting Unit 1 (the back residence) to the new sewer main
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/10/2025 | ADMINISTRATIVE v.2 | 10/13/2025 | REQUIRES RESUBMIT |
| 08/20/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 08/22/2025 | REQUIRES RESUBMIT |
| 12/04/2025 | ADMINISTRATIVE v.3 | 12/04/2025 | APPROVED |
| 08/28/2025 | RESIDENTIAL SIMPLE REVIEW v.2 | 08/28/2025 | REQUIRES RESUBMIT |
| 09/30/2025 | RESIDENTIAL SIMPLE REVIEW v.3 | 10/02/2025 | APPROVED |
| 10/02/2025 | ADMINISTRATIVE v.1 | 10/02/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0825-04108
Permit Status: Complete
Permit Description: EDIT 09/30/2025: Connecting Unit 1 (the back residence) to the new sewer main
| Date | Description | Comments |
|---|---|---|
| 08/20/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/21/2025 | This project requires submission and approval of a Right-of-Way (ROW) permit prior to issuance of this permit. | |
| 08/21/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0825-04108
Permite Description: EDIT 09/30/2025: Connecting Unit 1 (the back residence) to the new sewer main
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2026 | COT - LCPL - Rough Soil | N/A | Not Applicable | |
| 01/23/2026 | COT - LCPL - Sewer | N/A | Partial Pass | Approximately 180’ 4” ABS on test. Tied into main sewer line. Tracer wire is in place. Okay to backfill proprogress areas. Pending remremaining progress to unit. 1/23/2026 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0825-04108
Permit Description: EDIT 09/30/2025: Connecting Unit 1 (the back residence) to the new sewer main
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2026 | COT - LCPL - Plumbing Progress | Passed | ||
| 02/06/2026 | COT - LCPL - Sewer | Passed | 2/6/2026 tie in complete and under test. Okay to backfill shading required. | |
| 02/06/2026 | COT - LCPL - Plumbing Final | Passed |