Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
08/19/2025
Applicant:
Arturo Rojo
Description:
EDIT 09/30/2025: Connecting Unit 1 (the back residence) to the new sewer main

Permit Reviews

Permit Number - TC-RES-0825-04108
Permit Status: Complete
Permit Description: EDIT 09/30/2025: Connecting Unit 1 (the back residence) to the new sewer main
Start Date Submittal Complete Date Status  
10/10/2025 ADMINISTRATIVE v.2 10/13/2025 REQUIRES RESUBMIT Review Details
08/20/2025 RESIDENTIAL SIMPLE REVIEW v.1 08/22/2025 REQUIRES RESUBMIT Review Details
12/04/2025 ADMINISTRATIVE v.3 12/04/2025 APPROVED Review Details
08/28/2025 RESIDENTIAL SIMPLE REVIEW v.2 08/28/2025 REQUIRES RESUBMIT Review Details
09/30/2025 RESIDENTIAL SIMPLE REVIEW v.3 10/02/2025 APPROVED Review Details
10/02/2025 ADMINISTRATIVE v.1 10/02/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0825-04108
Permit Status: Complete
Permit Description: EDIT 09/30/2025: Connecting Unit 1 (the back residence) to the new sewer main
Date Description Comments
08/20/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
08/21/2025 This project requires submission and approval of a Right-of-Way (ROW) permit prior to issuance of this permit.
08/21/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0825-04108
Permite Description: EDIT 09/30/2025: Connecting Unit 1 (the back residence) to the new sewer main
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
01/23/2026 COT - LCPL - Rough Soil N/A Not Applicable
01/23/2026 COT - LCPL - Sewer N/A Partial Pass Approximately 180’ 4” ABS on test. Tied into main sewer line. Tracer wire is in place. Okay to backfill proprogress areas. Pending remremaining progress to unit. 1/23/2026

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0825-04108
Permit Description: EDIT 09/30/2025: Connecting Unit 1 (the back residence) to the new sewer main
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/23/2026 COT - LCPL - Plumbing Progress Passed
02/06/2026 COT - LCPL - Sewer Passed 2/6/2026 tie in complete and under test. Okay to backfill shading required.
02/06/2026 COT - LCPL - Plumbing Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
OFFICE DEPOT SCAN 09-30-2025_13-57-50-586_V1.PDF DOCUMENTS VIEW
REVISE PERMIT 1725 S SAN ANTONIO_V1.PDF DOCUMENTS VIEW
REVISE PERMIT 1725 S SAN ANTONIO_V3.PDF DOCUMENTS VIEW