Permit: TC-RES-0825-04072
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
3551 N LILLY POND PL
Address NEW:
3551 N LILLY POND PL
Apply Date:
08/18/2025
Applicant:
TFS Solar
Description:
Roof mount 6.53 kW DC photovoltaic solar system; 15 modules with microinverters. 10 kWh Storage, 1 Enphase 10C battery. IQ combiner for PV and Batteries. 14-50 EV charger in Combiner Box. NEW backed up loads panel with 225A bus and 150A MCB. Partial home backup with Enphase meter collar on NEW 200A Meter Base. 200A bus with 200A MCB, interconnection via PCS.
Permit Reviews
Permit Number - TC-RES-0825-04072
Permit Status: Inspections
Permit Description: Roof mount 6.53 kW DC photovoltaic solar system; 15 modules with microinverters. 10 kWh Storage, 1 Enphase 10C battery. IQ combiner for PV and Batteries. 14-50 EV charger in Combiner Box.
NEW backed up loads panel with 225A bus and 150A MCB. Partial home backup with Enphase meter collar on NEW 200A Meter Base. 200A bus with 200A MCB, interconnection via PCS.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/30/2025 | RESIDENTIAL SOLAR REVISION v.1 | 11/10/2025 | APPROVED |
| 08/18/2025 | RESIDENTIAL SOLAR v.1 | 09/16/2025 | APPROVED |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0825-04072
Permit Description: Roof mount 6.53 kW DC photovoltaic solar system; 15 modules with microinverters. 10 kWh Storage, 1 Enphase 10C battery. IQ combiner for PV and Batteries. 14-50 EV charger in Combiner Box.
NEW backed up loads panel with 225A bus and 150A MCB. Partial home backup with Enphase meter collar on NEW 200A Meter Base. 200A bus with 200A MCB, interconnection via PCS.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2025 | BULD - Electrical Clearance | Passed | Passed solar final 11/17/25 CLEARANCE DGC/BAT | |
| 11/17/2025 | RSBU - Building Final | Passed | Passed solar final 11/17/25 CLEARANCE DGC/BAT | |
| 11/17/2025 | COT - RSOL - Electrical Final Solar Project | Passed | Passed solar final 11/17/25 CLEARANCE DGC/BAT |