Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address NEW:
6053 E SHIP ROCK DR
Apply Date:
08/11/2025
Applicant:
Hailey McGraw
Description:
REV_1 DC2 Equipment Revision; install 9.43kw residential roof mounted solar / SolarEdge Energy Bank / New 200A load center / New 125A generation panel (Existing System add on)

Permit Reviews

Permit Number - TC-RES-0825-03949
Permit Status: Inspections
Permit Description: REV_1 DC2 Equipment Revision; install 9.43kw residential roof mounted solar / SolarEdge Energy Bank / New 200A load center / New 125A generation panel (Existing System add on)
Start Date Submittal Complete Date Status  
12/23/2025 RESIDENTIAL SOLAR REVISION v.2 12/29/2025 APPROVED Review Details
08/12/2025 RESIDENTIAL SOLAR v.1 09/10/2025 APPROVED Review Details
12/15/2025 RESIDENTIAL SOLAR REVISION v.1 12/23/2025 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-RES-0825-03949
Permite Description: REV_1 DC2 Equipment Revision; install 9.43kw residential roof mounted solar / SolarEdge Energy Bank / New 200A load center / New 125A generation panel (Existing System add on)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/29/2025 COT - RSOL - Electrical Final Solar Project N/A Not Ready Called and voicemail was not setup. Texted (505) 525-5060. No response.
10/29/2025 RSBU - Building Final N/A Not Ready Called and voicemail was not setup. Texted (505) 525-5060. No response.
10/29/2025 BULD - Electrical Clearance N/A Not Ready Called and voicemail was not setup. Texted (505) 525-5060. No response.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-0825-03949
Permit Description: REV_1 DC2 Equipment Revision; install 9.43kw residential roof mounted solar / SolarEdge Energy Bank / New 200A load center / New 125A generation panel (Existing System add on)
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/15/2026 COT - RSOL - Electrical Final Solar Project Passed Passed 1/15/26 CLEARANCE DGC/BAT
01/15/2026 RSBU - Building Final Passed Passed 1/15/26 CLEARANCE DGC/BAT
01/15/2026 BULD - Electrical Clearance Passed Passed 1/15/26 CLEARANCE DGC/BAT

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CALCS_V1.PDF DOCUMENTS VIEW
CONS-CAROL GEE_STAMPED_PLANSET(FF_STAMPED)_REV2 RA_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLANS_V1.PDF DOCUMENTS VIEW