Permit: TC-RES-0825-03931
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1374 W HUALPAI RD
Address NEW:
1374 W HUALPAI RD
Apply Date:
08/08/2025
Applicant:
Brittney Neely
Description:
REV_1: 9.46 kW (7.678 kW AC) PV system, Updated module type and count Installation of a 9.430 kW rooftop mounted photovoltaic system with 200A MPU.
Permit Reviews
Permit Number - TC-RES-0825-03931
Permit Status: Complete
Permit Description: REV_1: 9.46 kW (7.678 kW AC) PV system, Updated module type and count
Installation of a 9.430 kW rooftop mounted photovoltaic system with 200A MPU.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/16/2025 | RESIDENTIAL SOLAR REVISION v.1 | 10/06/2025 | APPROVED |
| 08/11/2025 | RESIDENTIAL SOLAR v.1 | 09/09/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0825-03931
Permit Status: Complete
Permit Description: REV_1: 9.46 kW (7.678 kW AC) PV system, Updated module type and count
Installation of a 9.430 kW rooftop mounted photovoltaic system with 200A MPU.
| Date | Description | Comments |
|---|---|---|
| 08/11/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0825-03931
Permit Description: REV_1: 9.46 kW (7.678 kW AC) PV system, Updated module type and count
Installation of a 9.430 kW rooftop mounted photovoltaic system with 200A MPU.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 12/15/2025 | RSBU - Building Final | Passed | ||
| 12/15/2025 | BULD - Electrical Clearance | Passed | Clearance for TEP DGC. 12/15/2025 |