Permit: TC-RES-0825-03877
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3838 E CALLE FERNANDO
Address NEW:
3838 E CALLE FERNANDO
Apply Date:
08/06/2025
Applicant:
Noe Quijada
Description:
Roof-mounted PV solar installation, 32 modules, 14.4kW DC, 23.0kW AC, with energy storage, with Tesla Backup Switch, with SPAN panel.
Permit Reviews
Permit Number - TC-RES-0825-03877
Permit Status: Complete
Permit Description: Roof-mounted PV solar installation, 32 modules, 14.4kW DC, 23.0kW AC, with energy storage, with Tesla Backup Switch, with SPAN panel.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/06/2025 | RESIDENTIAL SOLAR v.1 | 09/04/2025 | REQUIRES RESUBMIT |
| 09/11/2025 | RESIDENTIAL SOLAR v.3 | 09/15/2025 | APPROVED |
| 09/11/2025 | RESIDENTIAL SOLAR v.2 | 09/11/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0825-03877
Permit Status: Complete
Permit Description: Roof-mounted PV solar installation, 32 modules, 14.4kW DC, 23.0kW AC, with energy storage, with Tesla Backup Switch, with SPAN panel.
| Date | Description | Comments |
|---|---|---|
| 08/06/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0825-03877
Permite Description: Roof-mounted PV solar installation, 32 modules, 14.4kW DC, 23.0kW AC, with energy storage, with Tesla Backup Switch, with SPAN panel.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/29/2025 | BULD - Electrical Clearance | N/A | Not Ready | Not ready. Provide or upload approved plans on site or on the dashboard prior to inspection. 10/29/2025 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0825-03877
Permit Description: Roof-mounted PV solar installation, 32 modules, 14.4kW DC, 23.0kW AC, with energy storage, with Tesla Backup Switch, with SPAN panel.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/22/2025 | BULD - Electrical Clearance | Passed | Clearance for TEP DGC/DGL/BAT. 12/22/2025 | |
| 12/22/2025 | RSBU - Building Final | Passed | ||
| 12/22/2025 | COT - RSOL - Electrical Final Solar Project | Passed |