Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
3310 N GREGORY DR
Apply Date:
08/06/2025
Applicant:
Inty Ops
Description:
REV_2, Module Location updated; REV_1; Installation of a 11.50 KW AC PV SYSTEM+ Battery

Permit Reviews

Permit Number - TC-RES-0825-03865
Permit Status: Complete
Permit Description: REV_2, Module Location updated; REV_1; Installation of a 11.50 KW AC PV SYSTEM+ Battery
Start Date Submittal Complete Date Status  
11/06/2025 RESIDENTIAL SOLAR REVISION v.1 11/26/2025 APPROVED Review Details
08/06/2025 RESIDENTIAL SOLAR v.1 09/03/2025 APPROVED Review Details
09/10/2025 RESIDENTIAL SOLAR REVISION v.1 09/29/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0825-03865
Permit Status: Complete
Permit Description: REV_2, Module Location updated; REV_1; Installation of a 11.50 KW AC PV SYSTEM+ Battery
Date Description Comments
09/03/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0825-03865
Permite Description: REV_2, Module Location updated; REV_1; Installation of a 11.50 KW AC PV SYSTEM+ Battery
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/26/2025 BULD - Electrical Clearance N/A Partial Pass Partial pass. Verbal clearance to TEP DGL. (Tesla backup switch). 12/26/2025

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0825-03865
Permit Description: REV_2, Module Location updated; REV_1; Installation of a 11.50 KW AC PV SYSTEM+ Battery
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/16/2026 BULD - Electrical Clearance Passed Passed final 1/16/26 CLEARANCE DGC/BAT
01/16/2026 COT - RSOL - Electrical Final Solar Project Passed Passed final 1/16/26 CLEARANCE DGC/BAT
01/16/2026 RSBU - Building Final Passed Passed final 1/16/26 CLEARANCE DGC/BAT

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-JOSE ENCINAS-JOHNSTON PLANS V07 SS_V1.PDF DOCUMENTS VIEW
JOSE ENCINAS-JOHNSTON LETTER SS TC-RES-0825-03865_V1.PDF DOCUMENTS VIEW
JOSE ENCINAS-JOHNSTON LETTER SS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-JOSE ENCINAS-JOHNSTON PLANS V04 SS_V1.PDF DOCUMENTS VIEW
RESPONSE LETTER JOSE ENCINAS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-JOSE ENCINAS-JOHNSTON PLANS V01 SS-_V1.PDF DOCUMENTS VIEW
EQUIPMENT SPECIFICATION JOSE_V1.PDF DOCUMENTS VIEW
JOSE ENCINAS-JOHNSTON LETTER SS (1)_V1.PDF DOCUMENTS VIEW