Permit: TC-RES-0824-04579
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
232 S AVENIDA DEL PALO FIERRO
Address NEW:
232 S AVENIDA DEL PALO FIERRO
Apply Date:
08/06/2024
Applicant:
Anne Helwig
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0824-04579
Permit Status: Issued
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/06/2024 | RESIDENTIAL NEW DWELLING v.1 | 09/10/2024 | APPROVED |
| 02/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/26/2025 | APPROVED |
| 05/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/15/2025 | APPROVED |
| 11/05/2024 | RESIDENTIAL NEW DWELLING REVISION v.1 | 12/09/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-RES-0824-04579
Permit Status: Issued
Permit Description: SFR
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/14/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-RES-0824-04579
Permit Status: Issued
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 01/27/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/14/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 02/25/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 08/14/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0824-04579
Permite Description: SFR
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/15/2024 | COT - RSEL - Electrical Underground | N/A | Partial Pass | 11/15/24 conduit is re routes, partial pass to back fill the run under the slab. |
| 12/20/2024 | COT - RSBU - Masonry Pregrout | N/A | Partial Pass | 12/20/24 passed, Ok to proceed. |
| 07/09/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 07/11/2025 | COT - RSEL - Electrical Final | N/A | Partial Pass | This inspection is for the continuation of Electric Intermediate at electric door closers and in wall electric. |
| 12/30/2024 | COT - RSBU - Interior Shear Bracing | N/A | Partial Pass | This inspection is for masonry pre-grout of exterior walls and courtyard walls at 9’4”. OK to grout progress areas. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0824-04579
Permit Description: SFR
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2024 | COT - RSPL - Yard Water Line | Passed | 11/1/24: Main water lines per plan and under pressure ok to backfill. Shading required | |
| 11/06/2024 | COT - RSPL - Rough Soil | Passed | OK to cover progress areas. | |
| 11/06/2024 | COT - RSPL - Sewer | Passed | OK to cover progress areas. | |
| 12/03/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 12/03/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Footings and post tension cable are in place. Ok to place concrete in progress areas. | |
| 12/03/2024 | COT - RSBU - Preslab | Passed | OK to place concrete in slab/footing areas. | |
| 12/03/2024 | COT - RSEL - Grounding/Bonding | Passed | Electric ufer is in place. | |
| 02/10/2025 | COT - RSBU - Masonry Pregrout | Passed | 2/10/25 complete, ok to proceed | |
| 04/22/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/22/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 05/13/2025 | COT - BULD - SWG Clearance | Passed | 5-13-25, corrections made, verified gas pressure test at 15psi. Clearance issued to SWG. | |
| 07/09/2025 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | Interior walls and penetrations have been Fire caulked | |
| 07/14/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to insulate and sheet rock throughout. | |
| 09/05/2025 | BULD - Electrical Clearance | Passed | Meter bank located at 236 E. Avenida Del Palo Fierro |