Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
1815 S CAMINO SECO
Apply Date:
08/24/2023
Applicant:
Noe Quijada
Description:
Roof-mounted PV solar installation, addition to existing system. New system: 15 modules, 6.15kW DC, 4.875kW AC. Total system: 45 modules, 14.85kW DC, 12.475kW AC

Permit Reviews

Permit Number - TC-RES-0823-07595
Permit Status: Complete
Permit Description: Roof-mounted PV solar installation, addition to existing system. New system: 15 modules, 6.15kW DC, 4.875kW AC. Total system: 45 modules, 14.85kW DC, 12.475kW AC
Start Date Submittal Complete Date Status  
08/26/2023 RESIDENTIAL SOLAR v.1 08/28/2023 APPROVED Review Details

Conditions

Permit Number - TC-RES-0823-07595
Permit Status: Complete
Permit Description: Roof-mounted PV solar installation, addition to existing system. New system: 15 modules, 6.15kW DC, 4.875kW AC. Total system: 45 modules, 14.85kW DC, 12.475kW AC
Date Description Comments
08/28/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0823-07595
Permit Description: Roof-mounted PV solar installation, addition to existing system. New system: 15 modules, 6.15kW DC, 4.875kW AC. Total system: 45 modules, 14.85kW DC, 12.475kW AC
Total Completed Inspections - 3
Date Description Inspector Results Comments
11/27/2023 COT - RSOL - Electrical Final Solar Project Passed
11/27/2023 BULD - Electrical Clearance Passed Approved, DGC Clearance to TEP is required for the solar meter
11/27/2023 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SETH LEVY SYSTEM 2_V0_08-22-2023_V1.PDF DOCUMENTS VIEW