Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2733 W PAULEY PL
Address NEW:
2733 W PAULEY PL
Apply Date:
08/24/2023
Applicant:
Bailey Randall
Description:
Roof mounted PV system 7.6kwdc//5.51kwac REV1: Remove 200A MPU. Interconnection at ConnectDER meter collar.

Permit Reviews

Permit Number - TC-RES-0823-07594
Permit Status: Complete
Permit Description: Roof mounted PV system 7.6kwdc//5.51kwac REV1: Remove 200A MPU. Interconnection at ConnectDER meter collar.
Start Date Submittal Complete Date Status  
08/26/2023 RESIDENTIAL SOLAR v.1 08/28/2023 APPROVED Review Details
03/18/2024 RESIDENTIAL SOLAR v.1 04/18/2024 APPROVED Review Details
05/06/2024 RESIDENTIAL SOLAR v.1 05/20/2024 APPROVED Review Details

Conditions

Permit Number - TC-RES-0823-07594
Permit Status: Complete
Permit Description: Roof mounted PV system 7.6kwdc//5.51kwac REV1: Remove 200A MPU. Interconnection at ConnectDER meter collar.
Date Description Comments
08/29/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0823-07594
Permite Description: Roof mounted PV system 7.6kwdc//5.51kwac REV1: Remove 200A MPU. Interconnection at ConnectDER meter collar.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/10/2024 BULD - Electrical Clearance N/A Partial Pass Partial pass. Verbal clearance for TEP DGL. For MSA. 5/10/2024

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0823-07594
Permit Description: Roof mounted PV system 7.6kwdc//5.51kwac REV1: Remove 200A MPU. Interconnection at ConnectDER meter collar.
Total Completed Inspections - 4
Date Description Inspector Results Comments
05/30/2024 BULD - Electrical Clearance Passed Approved with meter adapter, DGC/DGL Clearance to TEP is required for the solar meter
05/30/2024 COT - RSOL - Electrical Final Solar Project Passed
05/30/2024 RSBU - Building Final Passed
05/30/2024 COT - RSOL - Grounding/Bonding Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
223732_STRUCTURAL_ENGINEERING_V1.PDF DOCUMENTS VIEW
CONS-223733_STRUCTURAL_ENGINEERING_V1.PDF DOCUMENTS VIEW
LEWIS SKAMSER REV NARRATIVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-218013_STRUCTURAL_ENGINEERING_V1.PDF DOCUMENTS VIEW
RESPONSE LETTER- TC-RES-0823-07594_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
187962_STRUCTURAL_ENGINEERING_V1.PDF DOCUMENTS VIEW
CONS-187961_STRUCTURAL_ENGINEERING_V1.PDF DOCUMENTS VIEW
VSUN-400-108M-BB (6) COP COPY 27_V1.PDF DOCUMENTS VIEW