Permit: TC-RES-0823-07594
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2733 W PAULEY PL
Address NEW:
2733 W PAULEY PL
Apply Date:
08/24/2023
Applicant:
Bailey Randall
Description:
Roof mounted PV system 7.6kwdc//5.51kwac REV1: Remove 200A MPU. Interconnection at ConnectDER meter collar.
Permit Reviews
Permit Number - TC-RES-0823-07594
Permit Status: Complete
Permit Description: Roof mounted PV system
7.6kwdc//5.51kwac
REV1: Remove 200A MPU. Interconnection at ConnectDER meter collar.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/26/2023 | RESIDENTIAL SOLAR v.1 | 08/28/2023 | APPROVED |
| 03/18/2024 | RESIDENTIAL SOLAR v.1 | 04/18/2024 | APPROVED |
| 05/06/2024 | RESIDENTIAL SOLAR v.1 | 05/20/2024 | APPROVED |
Conditions
Permit Number - TC-RES-0823-07594
Permit Status: Complete
Permit Description: Roof mounted PV system
7.6kwdc//5.51kwac
REV1: Remove 200A MPU. Interconnection at ConnectDER meter collar.
| Date | Description | Comments |
|---|---|---|
| 08/29/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0823-07594
Permite Description: Roof mounted PV system
7.6kwdc//5.51kwac
REV1: Remove 200A MPU. Interconnection at ConnectDER meter collar.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Partial pass. Verbal clearance for TEP DGL. For MSA. 5/10/2024 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0823-07594
Permit Description: Roof mounted PV system
7.6kwdc//5.51kwac
REV1: Remove 200A MPU. Interconnection at ConnectDER meter collar.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/30/2024 | BULD - Electrical Clearance | Passed | Approved with meter adapter, DGC/DGL Clearance to TEP is required for the solar meter | |
| 05/30/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 05/30/2024 | RSBU - Building Final | Passed | ||
| 05/30/2024 | COT - RSOL - Grounding/Bonding Solar Project | Passed |