Permit: TC-RES-0823-07556
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1521 S SLEEPY HOLLOW PL
Address NEW:
1521 S SLEEPY HOLLOW PL
Apply Date:
08/23/2023
Applicant:
Hailey McGraw
Description:
ROOF MOUNTED PV SYSTEM 4.56kW DC / 3.8kW AC 12 modules REV 1: Mounting swapped from ballast to chem curb tilted. Module type changed. 4.620 kW DC REV 2: Relocated the MSP and Meter.
Permit Reviews
Permit Number - TC-RES-0823-07556
Permit Status: Complete
Permit Description: ROOF MOUNTED PV SYSTEM
4.56kW DC / 3.8kW AC
12 modules
REV 1: Mounting swapped from ballast to chem curb tilted. Module type changed.
4.620 kW DC
REV 2: Relocated the MSP and Meter.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/19/2024 | RESIDENTIAL SOLAR v.2 | 01/22/2024 | APPROVED |
| 12/26/2023 | RESIDENTIAL SOLAR v.1 | 01/03/2024 | APPROVED |
| 01/09/2024 | RESIDENTIAL SOLAR v.1 | 01/17/2024 | REQUIRES RESUBMIT |
| 08/24/2023 | RESIDENTIAL SOLAR v.1 | 08/29/2023 | APPROVED |
| 04/16/2024 | RESIDENTIAL SOLAR v.1 | 04/25/2024 | APPROVED |
Conditions
Permit Number - TC-RES-0823-07556
Permit Status: Complete
Permit Description: ROOF MOUNTED PV SYSTEM
4.56kW DC / 3.8kW AC
12 modules
REV 1: Mounting swapped from ballast to chem curb tilted. Module type changed.
4.620 kW DC
REV 2: Relocated the MSP and Meter.
| Date | Description | Comments |
|---|---|---|
| 08/29/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0823-07556
Permit Description: ROOF MOUNTED PV SYSTEM
4.56kW DC / 3.8kW AC
12 modules
REV 1: Mounting swapped from ballast to chem curb tilted. Module type changed.
4.620 kW DC
REV 2: Relocated the MSP and Meter.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/03/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter | |
| 05/03/2024 | RSBU - Building Final | Passed | ||
| 05/03/2024 | COT - RSOL - Electrical Final Solar Project | Passed |