Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
08/23/2023
Applicant:
Hailey McGraw
Description:
ROOF MOUNTED PV SYSTEM 4.56kW DC / 3.8kW AC 12 modules REV 1: Mounting swapped from ballast to chem curb tilted. Module type changed. 4.620 kW DC REV 2: Relocated the MSP and Meter.

Permit Reviews

Permit Number - TC-RES-0823-07556
Permit Status: Complete
Permit Description: ROOF MOUNTED PV SYSTEM 4.56kW DC / 3.8kW AC 12 modules REV 1: Mounting swapped from ballast to chem curb tilted. Module type changed. 4.620 kW DC REV 2: Relocated the MSP and Meter.
Start Date Submittal Complete Date Status  
01/19/2024 RESIDENTIAL SOLAR v.2 01/22/2024 APPROVED Review Details
12/26/2023 RESIDENTIAL SOLAR v.1 01/03/2024 APPROVED Review Details
01/09/2024 RESIDENTIAL SOLAR v.1 01/17/2024 REQUIRES RESUBMIT Review Details
08/24/2023 RESIDENTIAL SOLAR v.1 08/29/2023 APPROVED Review Details
04/16/2024 RESIDENTIAL SOLAR v.1 04/25/2024 APPROVED Review Details

Conditions

Permit Number - TC-RES-0823-07556
Permit Status: Complete
Permit Description: ROOF MOUNTED PV SYSTEM 4.56kW DC / 3.8kW AC 12 modules REV 1: Mounting swapped from ballast to chem curb tilted. Module type changed. 4.620 kW DC REV 2: Relocated the MSP and Meter.
Date Description Comments
08/29/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0823-07556
Permit Description: ROOF MOUNTED PV SYSTEM 4.56kW DC / 3.8kW AC 12 modules REV 1: Mounting swapped from ballast to chem curb tilted. Module type changed. 4.620 kW DC REV 2: Relocated the MSP and Meter.
Total Completed Inspections - 3
Date Description Inspector Results Comments
05/03/2024 BULD - Electrical Clearance Passed Approved, DGC Clearance to TEP is required for the solar meter
05/03/2024 RSBU - Building Final Passed
05/03/2024 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SUB 5 PLAN SET - CATHERINE OLMSTEAD_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SUB 4 PLAN SET - CATHERINE OLMSTRAD_V2.PDF DOCUMENTS VIEW
SUB 4 COMMENT LETTER - CATHERINE OLMSTEAD_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COMMENT LETTER - CARTHERINE OLMSTEAD_V1.PDF DOCUMENTS VIEW
CONS-SUB 2 PLANS - CATHERINE OLMSTEAD_V1.PDF DOCUMENTS VIEW
SUB 2 PE LETTER - CATHERINE OLMSTEAD_V1.PDF DOCUMENTS VIEW
SUB 2 STRUCTURAL CALCS - CATHERINE OLMSTEAD_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLANS - CATHERINE OLMSTEAD_V1.PDF DOCUMENTS VIEW
PE LETTER - CATHERINE OLMSTEAD_V1.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS - CATHERINE OLMSTEAD_V1.PDF DOCUMENTS VIEW