Permit: TC-RES-0823-07258
Permit Details
Apply Date:
08/11/2023
Applicant:
Natalia Soto
Description:
18.400 kW rooftop PV solar system installation 46- ENPHASE IQ8M-72-2-US(240V) 46- Q.PEAK DUO BLK ML-G10+400 1- 125A SOLAR LOAD CENETR 1- 225A/175A SUB PANEL (N)400A SPLIT BUS TOP FED MAIN PANEL
Permit Reviews
Permit Number - TC-RES-0823-07258
Permit Status: Issued
Permit Description: 18.400 kW rooftop PV solar system installation
46- ENPHASE IQ8M-72-2-US(240V)
46- Q.PEAK DUO BLK ML-G10+400
1- 125A SOLAR LOAD CENETR
1- 225A/175A SUB PANEL
(N)400A SPLIT BUS TOP FED MAIN PANEL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/14/2023 | RESIDENTIAL SOLAR v.1 | 08/21/2023 | APPROVED |
12/01/2023 | RESIDENTIAL SOLAR v.2 | 12/21/2023 | APPROVED |
11/03/2023 | RESIDENTIAL SOLAR v.1 | 11/21/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0823-07258
Permite Description: 18.400 kW rooftop PV solar system installation
46- ENPHASE IQ8M-72-2-US(240V)
46- Q.PEAK DUO BLK ML-G10+400
1- 125A SOLAR LOAD CENETR
1- 225A/175A SUB PANEL
(N)400A SPLIT BUS TOP FED MAIN PANEL
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/15/2024 | BULD - Electrical Clearance | N/A | Not Applicable | No need for clearance derate |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0823-07258
Permit Description: 18.400 kW rooftop PV solar system installation
46- ENPHASE IQ8M-72-2-US(240V)
46- Q.PEAK DUO BLK ML-G10+400
1- 125A SOLAR LOAD CENETR
1- 225A/175A SUB PANEL
(N)400A SPLIT BUS TOP FED MAIN PANEL
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/21/2024 | BULD - Electrical Clearance | Passed | ||
02/21/2024 | COT - RSOL - Grounding/Bonding Solar Project | Passed | ||
02/21/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
02/21/2024 | RSBU - Building Final | Passed |