Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
2022 N CLOVERLAND AV
Apply Date:
08/08/2023
Applicant:
Jim Wilber
Description:
Installation of 8.000 kW DC Photovoltaic System 20 modules.

Permit Reviews

Permit Number - TC-RES-0823-07167
Permit Status: Complete
Permit Description: Installation of 8.000 kW DC Photovoltaic System 20 modules.
Start Date Submittal Complete Date Status  
08/09/2023 RESIDENTIAL SOLAR v.1 08/23/2023 REQUIRES RESUBMIT Review Details
09/29/2023 RESIDENTIAL SOLAR v.2 10/20/2023 APPROVED Review Details

Conditions

Permit Number - TC-RES-0823-07167
Permit Status: Complete
Permit Description: Installation of 8.000 kW DC Photovoltaic System 20 modules.
Date Description Comments
10/26/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0823-07167
Permite Description: Installation of 8.000 kW DC Photovoltaic System 20 modules.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/28/2023 BULD - Electrical Clearance N/A Canceled 12/28/23 Canceled per contractor
12/28/2023 RSBU - Building Final N/A Canceled 12/28/23 Canceled per contractor
12/28/2023 COT - RSOL - Electrical Final Solar Project N/A Canceled 12/28/23 Canceled per contractor

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0823-07167
Permit Description: Installation of 8.000 kW DC Photovoltaic System 20 modules.
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/08/2024 BULD - Electrical Clearance Passed
01/08/2024 RSBU - Building Final Passed
01/08/2024 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2022CLOVERLANDLETTERRESPONSE_V1.PDF DOCUMENTS VIEW
CONS-HASTINGSPLANS_V2.PDF DOCUMENTS VIEW
S5CLAMP_V1.PDF DOCUMENTS VIEW