Permit: TC-RES-0823-07086
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
9336 E WRIGHTSTOWN RD
Address NEW:
9336 E WRIGHTSTOWN RD
Apply Date:
08/06/2023
Applicant:
Jed Mayfield
Description:
Great Room; Bedroom Suite and Garage Addition
Permit Reviews
Permit Number - TC-RES-0823-07086
Permit Status: Complete
Permit Description: Great Room; Bedroom Suite and Garage Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/11/2023 | RESIDENTIAL NEW DWELLING v.1 | 08/17/2023 | REQUIRES RESUBMIT |
| 05/20/2024 | RESIDENTIAL NEW DWELLING v.2 | 05/28/2024 | APPROVED |
| 05/28/2024 | RESTAMP - RESIDENTIAL v.1 | 05/29/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-RES-0823-07086
Permit Status: Complete
Permit Description: Great Room; Bedroom Suite and Garage Addition
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/07/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-RES-0823-07086
Permit Status: Complete
Permit Description: Great Room; Bedroom Suite and Garage Addition
| Date | Description | Comments |
|---|---|---|
| 05/20/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0823-07086
Permite Description: Great Room; Bedroom Suite and Garage Addition
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2024 | COT - RSPL - Sewer | N/A | Not Applicable | |
| 09/26/2024 | COT - RSEL - Grounding/Bonding | N/A | Not Applicable | |
| 09/26/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 01/02/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 1/2/25 city stamped plans must be on site. Fire blocking needed at top rear of bathtub. Re inspection is required. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0823-07086
Permit Description: Great Room; Bedroom Suite and Garage Addition
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2024 | COT - RSPL - Rough Soil | Passed | ||
| 09/18/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 09/25/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, rebar reinforcement is installed for footings and slab, pipes are properly wrapped, shear wall hold downs and masa clips are installed, and subsoil is properly compacted. Okay to pour concrete for footings and slab. | |
| 09/25/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, rebar reinforcement is installed for footings and slab, pipes are properly wrapped, shear wall hold downs and masa clips are installed, and subsoil is properly compacted. Okay to pour concrete for footings and slab. | |
| 10/16/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 10/16/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 01/06/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/26/2025 | COT - RSME - Mechanical Final | Passed | Passed final 8/26/25 | |
| 08/26/2025 | RSBU - Building Final | Passed | Passed final 8/26/25 | |
| 08/26/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 8/26/25 | |
| 08/26/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 8/26/25 | |
| 08/26/2025 | COT - RSEL - Electrical Final | Passed | Passed final 8/26/25 |