Permit: TC-RES-0823-07037
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1941 N CAMINO PIO DECIMO
Address NEW:
1941 N CAMINO PIO DECIMO
Apply Date:
08/03/2023
Applicant:
Bailey Randall
Description:
Roof Mounted PV DC SYSTEM SIZE (kW): 6.4 kW AC SYSTEM SIZE (kW): 4.64 kW
Permit Reviews
Permit Number - TC-RES-0823-07037
Permit Status: Complete
Permit Description: Roof Mounted PV
DC SYSTEM SIZE (kW): 6.4 kW
AC SYSTEM SIZE (kW): 4.64 kW
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/04/2023 | RESIDENTIAL SOLAR v.1 | 08/09/2023 | APPROVED |
| 09/14/2023 | RESIDENTIAL SOLAR v.1 | 09/25/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0823-07037
Permit Status: Complete
Permit Description: Roof Mounted PV
DC SYSTEM SIZE (kW): 6.4 kW
AC SYSTEM SIZE (kW): 4.64 kW
| Date | Description | Comments |
|---|---|---|
| 09/25/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0823-07037
Permite Description: Roof Mounted PV
DC SYSTEM SIZE (kW): 6.4 kW
AC SYSTEM SIZE (kW): 4.64 kW
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/20/2023 | BULD - Electrical Clearance | N/A | Partial Pass | TEP INCR |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0823-07037
Permit Description: Roof Mounted PV
DC SYSTEM SIZE (kW): 6.4 kW
AC SYSTEM SIZE (kW): 4.64 kW
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2023 | COT - RSOL - Grounding/Bonding Solar Project | Passed | ||
| 10/10/2023 | RSBU - Building Final | Passed | ||
| 10/10/2023 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 10/10/2023 | BULD - Electrical Clearance | Passed |