Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
08/02/2023
Applicant:
Kevin Flaws
Description:
INSTALLATION OF ADDITIONAL 6 MODULE, 2.4O kW DC FLUSH-ROOF MOUNTED SOLAR PV ARRAYS + 10 TIGO TS4-A-2F RSD DEVICES TO EXISTING 13 MODULE, 3.84 kW DC FLUSH-ROOF MOUNTED SOLAR PV ARRAYS ON EXISTING PITCHED COMPOSITE ASPHALT SHINGLE ROOF PLANES.

Permit Reviews

Permit Number - TC-RES-0823-06994
Permit Status: Inspections complete
Permit Description: INSTALLATION OF ADDITIONAL 6 MODULE, 2.4O kW DC FLUSH-ROOF MOUNTED SOLAR PV ARRAYS + 10 TIGO TS4-A-2F RSD DEVICES TO EXISTING 13 MODULE, 3.84 kW DC FLUSH-ROOF MOUNTED SOLAR PV ARRAYS ON EXISTING PITCHED COMPOSITE ASPHALT SHINGLE ROOF PLANES.
Start Date Submittal Complete Date Status  
08/03/2023 RESIDENTIAL SOLAR v.1 08/04/2023 APPROVED Review Details

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0823-06994
Permit Description: INSTALLATION OF ADDITIONAL 6 MODULE, 2.4O kW DC FLUSH-ROOF MOUNTED SOLAR PV ARRAYS + 10 TIGO TS4-A-2F RSD DEVICES TO EXISTING 13 MODULE, 3.84 kW DC FLUSH-ROOF MOUNTED SOLAR PV ARRAYS ON EXISTING PITCHED COMPOSITE ASPHALT SHINGLE ROOF PLANES.
Total Completed Inspections - 3
Date Description Inspector Results Comments
08/30/2023 BULD - Electrical Clearance Passed Approved, DGC Clearance to TEP is required for the solar meter
08/30/2023 RSBU - Building Final Passed
08/30/2023 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-1_PLAN SET_V1.PDF DOCUMENTS VIEW