Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
4301 E COOPER CI
Address NEW:
4301 E COOPER CI
Apply Date:
07/27/2026
Applicant:
Inty Ops
Description:
REV_2, Equipment location revision REV_1, equipment location revision; INSTALLATION OF A TESLA POWERWALL 3 ENERGY STORAGE

Permit Reviews

Permit Number - TC-RES-0726-04148
Permit Status: Inspections
Permit Description: REV_2, Equipment location revision REV_1, equipment location revision; INSTALLATION OF A TESLA POWERWALL 3 ENERGY STORAGE
Start Date Submittal Complete Date Status  
08/04/2026 RESIDENTIAL SIMPLE REVIEW REVISION v.1 08/04/2026 APPROVED Review Details
08/25/2026 RESIDENTIAL SIMPLE REVIEW REVISION v.1 08/26/2026 APPROVED Review Details
07/27/2026 RESIDENTIAL SIMPLE REVIEW v.1 07/28/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-0726-04148
Permit Status: Inspections
Permit Description: REV_2, Equipment location revision REV_1, equipment location revision; INSTALLATION OF A TESLA POWERWALL 3 ENERGY STORAGE
Date Description Comments
07/28/2026 Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-0726-04148
Permit Description: REV_2, Equipment location revision REV_1, equipment location revision; INSTALLATION OF A TESLA POWERWALL 3 ENERGY STORAGE
Total Completed Inspections - 2
Date Description Inspector Results Comments
09/11/2026 COT - RSEL - Electrical Final Passed
09/11/2026 BULD - Electrical Clearance Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-PATRICIA BEAUDRY_V2_08-13-2026-4301-COOPER-CI_V1.PDF DOCUMENTS VIEW
RESPONSE LETTER-2026-08-25_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-PATRICIA BEAUDRY_V1_08-01-2026-4301-COOPER-CI_V1.PDF DOCUMENTS VIEW
RESPONSE LETTER-2026-08-04_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
PATRICIA BEAUDRY_V0_07-24-2026_V1.PDF DOCUMENTS VIEW