Permit: TC-RES-0726-04096
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
8251 E ZEMSKY ST
Address NEW:
8251 E ZEMSKY ST
Apply Date:
07/23/2026
Applicant:
Project Manager
Description:
Roof solar installation 5.265kW system size with Battery storage
Permit Reviews
Permit Number - TC-RES-0726-04096
Permit Status: Complete
Permit Description: Roof solar installation 5.265kW system size with Battery storage
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/23/2026 | RESIDENTIAL SOLAR v.1 | N/A | REQUIRES RESUBMIT |
| 08/04/2026 | RESIDENTIAL SOLAR v.2 | 08/11/2026 | REQUIRES RESUBMIT |
| 09/01/2026 | RESIDENTIAL SOLAR v.3 | 09/09/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0726-04096
Permit Status: Complete
Permit Description: Roof solar installation 5.265kW system size with Battery storage
| Date | Description | Comments |
|---|---|---|
| 09/09/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0726-04096
Permit Description: Roof solar installation 5.265kW system size with Battery storage
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/09/2026 | BULD - Electrical Clearance | Passed | TEP CLEARANCE: DGC/BAT | |
| 10/09/2026 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/09/2026 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 10/09/2026 | RSBU - Building Final | Passed |