Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3200 W TUCANA ST
Address NEW:
3200 W TUCANA ST
Apply Date:
07/06/2026
Applicant:
TFS Solar
Description:
Roof mount 1.7kW DC addition to existing photovoltaic solar system (new system size 10.92kW). 4 additional modules; 27 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 4 strings. 1 battery expansion pack, (no inverter); 225A bus with 200A MCB, interconnection via 120% rule, Tesla Backup Switch for whole home backup. Re-string all existing modules to powerwall-3.

Permit Reviews

Permit Number - TC-RES-0726-03636
Permit Status: Complete
Permit Description: Roof mount 1.7kW DC addition to existing photovoltaic solar system (new system size 10.92kW). 4 additional modules; 27 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 4 strings. 1 battery expansion pack, (no inverter); 225A bus with 200A MCB, interconnection via 120% rule, Tesla Backup Switch for whole home backup. Re-string all existing modules to powerwall-3.
Start Date Submittal Complete Date Status  
07/06/2026 RESIDENTIAL SOLAR v.1 07/15/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-0726-03636
Permit Status: Complete
Permit Description: Roof mount 1.7kW DC addition to existing photovoltaic solar system (new system size 10.92kW). 4 additional modules; 27 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 4 strings. 1 battery expansion pack, (no inverter); 225A bus with 200A MCB, interconnection via 120% rule, Tesla Backup Switch for whole home backup. Re-string all existing modules to powerwall-3.
Date Description Comments
07/15/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0726-03636
Permit Description: Roof mount 1.7kW DC addition to existing photovoltaic solar system (new system size 10.92kW). 4 additional modules; 27 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 4 strings. 1 battery expansion pack, (no inverter); 225A bus with 200A MCB, interconnection via 120% rule, Tesla Backup Switch for whole home backup. Re-string all existing modules to powerwall-3.
Total Completed Inspections - 4
Date Description Inspector Results Comments
10/14/2026 COT - RSEL - Grounding/Bonding Passed
10/14/2026 COT - RSOL - Electrical Final Solar Project Passed
10/14/2026 RSBU - Building Final Passed
10/20/2026 BULD - Electrical Clearance Passed DGC/BAT

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-CRAIG ROBERT PV SERVICE STORAGE COMBO-DRAWINGS_V1.PDF DOCUMENTS VIEW
CRAIG ROBERT PV SERVICE STORAGE COMBO-SPECS_V1.PDF DOCUMENTS VIEW