Permit: TC-RES-0725-03776
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2081 S HIDDEN PASTURE LN
Address NEW:
2081 S HIDDEN PASTURE LN
Apply Date:
07/31/2025
Applicant:
angie seymour
Description:
Bedroom Added to Interior by Previous Owner
Permit Reviews
Permit Number - TC-RES-0725-03776
Permit Status: Complete
Permit Description: Bedroom Added to Interior by Previous Owner
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/02/2025 | RESTAMP - RESIDENTIAL v.1 | 09/03/2025 | APPROVED |
| 09/10/2025 | ADMINISTRATIVE v.2 | 09/10/2025 | REQUIRES RESUBMIT |
| 09/02/2025 | RESIDENTIAL ADD/ALT v.2 | 09/02/2025 | APPROVED |
| 09/08/2025 | ADMINISTRATIVE v.1 | 09/08/2025 | REQUIRES RESUBMIT |
| 09/11/2025 | ADMINISTRATIVE v.3 | 09/11/2025 | APPROVED |
| 08/01/2025 | RESIDENTIAL ADD/ALT v.1 | 08/21/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0725-03776
Permit Status: Complete
Permit Description: Bedroom Added to Interior by Previous Owner
| Date | Description | Comments |
|---|---|---|
| 08/01/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0725-03776
Permit Description: Bedroom Added to Interior by Previous Owner
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | New bedroom per approved plans | |
| 09/15/2025 | COT - RSME - Mechanical Final | Passed | New bedroom per approved plans | |
| 09/15/2025 | COT - RSEL - Electrical Final | Passed | New bedroom per approved plans | |
| 09/15/2025 | RSBU - Building Final | Passed | New bedroom per approved plans |