Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0725-03738
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
204 N LONGFELLOW AV UNIT 2
Address NEW:
204 N LONGFELLOW AV UNIT 2
Apply Date:
07/29/2025
Applicant:
TFS Solar
Description:
Roof mount 4.79kW DC photovoltaic solar system; 11 modules. 20 kWh Storage, (2) Enphase 10C batteries. IQ combiner for PV and Batteries. 200A bus with 200A MCB, interconnection via PCS, Enphase Meter Collar for whole home backup. 125A load controller subpanel fed from 6C combiner box. REV1_PV System disconnect has been added adjacent to the PV meter, to satisfy TEP's SR 702. Also shows required neutral from DG meter onward.
Permit Reviews
Permit Number - TC-RES-0725-03738
Permit Status: Complete
Permit Description: Roof mount 4.79kW DC photovoltaic solar system; 11 modules. 20 kWh Storage, (2) Enphase 10C batteries. IQ combiner for PV and Batteries. 200A bus with 200A MCB, interconnection via PCS, Enphase Meter Collar for whole home backup.
125A load controller subpanel fed from 6C combiner box.
REV1_PV System disconnect has been added adjacent to the PV meter, to satisfy TEP's SR 702. Also shows required neutral from DG meter onward.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/30/2025 | RESIDENTIAL SOLAR v.1 | 08/27/2025 | APPROVED |
| 08/28/2025 | RESIDENTIAL SOLAR REVISION v.1 | 09/24/2025 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0725-03738
Permit Description: Roof mount 4.79kW DC photovoltaic solar system; 11 modules. 20 kWh Storage, (2) Enphase 10C batteries. IQ combiner for PV and Batteries. 200A bus with 200A MCB, interconnection via PCS, Enphase Meter Collar for whole home backup.
125A load controller subpanel fed from 6C combiner box.
REV1_PV System disconnect has been added adjacent to the PV meter, to satisfy TEP's SR 702. Also shows required neutral from DG meter onward.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2025 | RSBU - Building Final | Passed | 10/14/25 passed solar final, clearance DGC/BAT | |
| 10/14/2025 | COT - RSOL - Electrical Final Solar Project | Passed | 10/14/25 passed solar final, clearance DGC/BAT | |
| 10/14/2025 | BULD - Electrical Clearance | Passed | 10/14/25 passed solar final, clearance DGC/BAT |