Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0725-03725
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2111 S STARR SKY DR
Address NEW:
2111 S STARR SKY DR
Apply Date:
07/29/2025
Applicant:
TFS Solar
Description:
40.5 kWh storage system addition to existing photovoltaic solar system. 2 Tesla powerwall-3 batteries and 1 battery expansion to 125A battery subpanel. 200A Tesla Gateway for partial home backup. 400A main service with 2x200 MCB. Interconnection on Auxiliary 200A MCB.
Permit Reviews
Permit Number - TC-RES-0725-03725
Permit Status: Complete
Permit Description: 40.5 kWh storage system addition to existing photovoltaic solar system. 2 Tesla powerwall-3 batteries and 1 battery expansion to 125A battery subpanel. 200A Tesla Gateway for partial home backup. 400A main service with 2x200 MCB.
Interconnection on Auxiliary 200A MCB.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/29/2025 | RESIDENTIAL SOLAR v.1 | 08/26/2025 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0725-03725
Permit Description: 40.5 kWh storage system addition to existing photovoltaic solar system. 2 Tesla powerwall-3 batteries and 1 battery expansion to 125A battery subpanel. 200A Tesla Gateway for partial home backup. 400A main service with 2x200 MCB.
Interconnection on Auxiliary 200A MCB.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2025 | RSBU - Building Final | Passed | ||
| 09/08/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 09/08/2025 | BULD - Electrical Clearance | Passed | Approved Battery addition to existing solar - BAT Clearance to TEP is required |