Permit: TC-RES-0725-03674
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
4741 E 3RD ST
Address NEW:
4741 E 3RD ST
Apply Date:
07/24/2025
Applicant:
TFS Solar
Description:
Ground mounted 6.53 kW DC photovoltaic solar system on a NEW Shade Structure. 15 modules with microinverters, 2 branches to PV Combiner Box. 30 A PV breaker on NEW 225A bus with 200A MCB. Overhead Service Upgrade to new 225A bus with 200A MCB.
Permit Reviews
Permit Number - TC-RES-0725-03674
Permit Status: Inspections complete
Permit Description: Ground mounted 6.53 kW DC photovoltaic solar system on a NEW Shade Structure. 15 modules with microinverters, 2 branches to PV Combiner Box. 30 A PV breaker on NEW 225A bus with 200A MCB.
Overhead Service Upgrade to new 225A bus with 200A MCB.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/16/2025 | RESIDENTIAL SOLAR REVISION v.1 | 11/07/2025 | APPROVED |
| 07/24/2025 | RESIDENTIAL SOLAR v.1 | 08/21/2025 | APPROVED |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0725-03674
Permite Description: Ground mounted 6.53 kW DC photovoltaic solar system on a NEW Shade Structure. 15 modules with microinverters, 2 branches to PV Combiner Box. 30 A PV breaker on NEW 225A bus with 200A MCB.
Overhead Service Upgrade to new 225A bus with 200A MCB.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/07/2025 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | Drove to residence, no response. No point of contact listed in the notes. |
| 10/03/2025 | BULD - Electrical Clearance | N/A | Canceled | 10.3.2025 Canceled by contractor. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0725-03674
Permit Description: Ground mounted 6.53 kW DC photovoltaic solar system on a NEW Shade Structure. 15 modules with microinverters, 2 branches to PV Combiner Box. 30 A PV breaker on NEW 225A bus with 200A MCB.
Overhead Service Upgrade to new 225A bus with 200A MCB.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/08/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Total of 4 drilled pier columns. Okay for concrete placement. 10/8/2025 | |
| 10/28/2025 | RSBU - Building Final | Passed | ||
| 10/28/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 10/28/2025 | BULD - Electrical Clearance | Passed | 10/28/2025 clearance for TEP DGC. |