Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0725-03664
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
8421 E SARNOFF PL
Address NEW:
8421 E SARNOFF PL
Apply Date:
07/23/2025
Applicant:
Brittney Neely
Description:
REV_1 Module count revised, 10.320 kW DC (8.37kW AC) rooftop pv system; Installation of a 10.660 kW rooftop mounted photovoltaic system.
Permit Reviews
Permit Number - TC-RES-0725-03664
Permit Status: Complete
Permit Description: REV_1 Module count revised, 10.320 kW DC (8.37kW AC) rooftop pv system; Installation of a 10.660 kW rooftop mounted photovoltaic system.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/24/2025 | RESIDENTIAL SOLAR v.1 | 08/21/2025 | APPROVED |
| 09/08/2025 | RESIDENTIAL SOLAR REVISION v.1 | 09/26/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0725-03664
Permit Status: Complete
Permit Description: REV_1 Module count revised, 10.320 kW DC (8.37kW AC) rooftop pv system; Installation of a 10.660 kW rooftop mounted photovoltaic system.
| Date | Description | Comments |
|---|---|---|
| 08/21/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0725-03664
Permit Description: REV_1 Module count revised, 10.320 kW DC (8.37kW AC) rooftop pv system; Installation of a 10.660 kW rooftop mounted photovoltaic system.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/24/2025 | COT - RSOL - Electrical Final Solar Project | Passed | Passed 11/24/25 CLEARANCE DGC | |
| 11/24/2025 | RSBU - Building Final | Passed | Passed 11/24/25 CLEARANCE DGC | |
| 12/15/2025 | BULD - Electrical Clearance | Passed | Clearance for TEP DGC/DGL. 12/15/2025 |