Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address NEW:
118 E MANOR VIEW RD
Apply Date:
07/21/2025
Applicant:
Albert Montoya
Description:
New Pool Build

Permit Reviews

Permit Number - TC-RES-0725-03613
Permit Status: Inspections
Permit Description: New Pool Build
Start Date Submittal Complete Date Status  
07/21/2025 RESIDENTIAL POOL v.1 07/31/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0725-03613
Permit Status: Inspections
Permit Description: New Pool Build
Date Description Comments
07/21/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-0725-03613
Permit Description: New Pool Build
Total Completed Inspections - 8
Date Description Inspector Results Comments
09/12/2025 Pool/Spa - Bonding Grip Passed
09/12/2025 Pool/Spa - Electric Passed
09/12/2025 Pool/Spa - Plumbing Passed 9.12.2025
Verified pump under test 30psi. Okay to backfill, shading required.
09/12/2025 Pool/Spa - Pre-Gunite Passed
09/12/2025 RSEL - Electrical Progress Passed
10/15/2025 COT - RSEL - Electrical Final Passed 10-15-25: electrical final approved.
10/15/2025 Pool/Spa - Final/Barrier Passed 10-15-25: final barrier consisting of self closing gate together with pool alarm verified per plans.
10/15/2025 RSBU - Building Final Passed 10-15-25: building final approved.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SELLERS PLANS_V1.PDF DOCUMENTS VIEW
SELLERS ENGINEERING_V1.PDF DOCUMENTS VIEW