Permit: TC-RES-0725-03581
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
10786 E PLACITA GUAJIRA
Address NEW:
10786 E PLACITA GUAJIRA
Apply Date:
07/18/2025
Applicant:
Description:
REV_1, 175A Main Breaker; Addition of 1-Tesla Powerwall-3 battery system, 1 - Tesla 200A Backup Switch
Permit Reviews
Permit Number - TC-RES-0725-03581
Permit Status: Inspections
Permit Description: REV_1, 175A Main Breaker; Addition of 1-Tesla Powerwall-3 battery system, 1 - Tesla 200A Backup Switch
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/23/2025 | RESIDENTIAL SOLAR REVISION v.3 | 12/23/2025 | APPROVED |
| 12/04/2025 | RESIDENTIAL SOLAR REVISION v.1 | 12/17/2025 | REQUIRES RESUBMIT |
| 07/18/2025 | RESIDENTIAL SOLAR v.1 | 08/14/2025 | APPROVED |
| 12/19/2025 | RESIDENTIAL SOLAR REVISION v.2 | 12/23/2025 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0725-03581
Permite Description: REV_1, 175A Main Breaker; Addition of 1-Tesla Powerwall-3 battery system, 1 - Tesla 200A Backup Switch
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/01/2025 | BULD - Electrical Clearance | N/A | Partial Pass | 12.01.2025 Verbal clearance to TEP DGL for MSA at 9:05am. Partial pending solar final. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0725-03581
Permit Description: REV_1, 175A Main Breaker; Addition of 1-Tesla Powerwall-3 battery system, 1 - Tesla 200A Backup Switch
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2026 | RSBU - Building Final | Passed | 1.6.25 Approved |
|
| 01/06/2026 | COT - RSOL - Electrical Final Solar Project | Passed | 1.6.25 Approved |
|
| 01/13/2026 | BULD - Electrical Clearance | Passed | 1.13.26 Approved for DGC/bat |