Permit: TC-RES-0725-03570
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
1319 W SPEEDWAY BL
Address NEW:
1319 W SPEEDWAY BL
Apply Date:
07/17/2025
Applicant:
Michael Sandquist
Description:
200 amp electrical meter/panel upgrade, conversion from OH service to UG service.
Permit Reviews
Permit Number - TC-RES-0725-03570
Permit Status: Inspections
Permit Description: 200 amp electrical meter/panel upgrade, conversion from OH service to UG service.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/17/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 07/18/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0725-03570
Permit Status: Inspections
Permit Description: 200 amp electrical meter/panel upgrade, conversion from OH service to UG service.
| Date | Description | Comments |
|---|---|---|
| 07/17/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0725-03570
Permit Description: 200 amp electrical meter/panel upgrade, conversion from OH service to UG service.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2025 | BULD - Electrical Clearance | Passed | 12.03.2025 Verbal clearance to TEP INCR for 200A MPU at 8:30am. |