Permit: TC-RES-0725-03427
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
8772 E 3RD ST
Address NEW:
8772 E 3RD ST
Apply Date:
07/09/2025
Applicant:
TFS Solar
Description:
27 kWh Storage addition to existing PV Solar system. 2 Tesla Powerwall-3 batteries added to existing PV system. 200A bus with downsized 175A MCB, interconnection via PCS for battery system, Tesla Backup Switch for whole home backup.
Permit Reviews
Permit Number - TC-RES-0725-03427
Permit Status: Complete
Permit Description: 27 kWh Storage addition to existing PV Solar system. 2 Tesla Powerwall-3 batteries added to existing PV system. 200A bus with downsized 175A MCB, interconnection via PCS for battery system, Tesla Backup Switch for whole home backup.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/09/2025 | RESIDENTIAL SOLAR v.1 | 08/06/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0725-03427
Permite Description: 27 kWh Storage addition to existing PV Solar system. 2 Tesla Powerwall-3 batteries added to existing PV system. 200A bus with downsized 175A MCB, interconnection via PCS for battery system, Tesla Backup Switch for whole home backup.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2025 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the Tesla meter switch and 175A derate - DGL Clearance was called into TEP at 10:15 am Pending solar final |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0725-03427
Permit Description: 27 kWh Storage addition to existing PV Solar system. 2 Tesla Powerwall-3 batteries added to existing PV system. 200A bus with downsized 175A MCB, interconnection via PCS for battery system, Tesla Backup Switch for whole home backup.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2025 | RSBU - Building Final | Passed | ||
| 09/24/2025 | COT - RSOL - Electrical Final Solar Project | Passed | Approved (2) PW3 battery storage for existing solar - BAT Clearance to TEP is required | |
| 09/24/2025 | BULD - Electrical Clearance | Passed | Approved (2) PW3 battery storage for existing solar - BAT Clearance to TEP is required |