Permit: TC-RES-0725-03410
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
4023 E PASEO DORADO
Address NEW:
4023 E PASEO DORADO
Apply Date:
07/08/2025
Applicant:
Mario Robles
Description:
Electric panel upgrade like for like 200 amps
Permit Reviews
Permit Number - TC-RES-0725-03410
Permit Status: Inspections
Permit Description: Electric panel upgrade like for like 200 amps
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/09/2025 | RESIDENTIAL SIMPLE REVIEW v.2 | 07/09/2025 | APPROVED |
| 07/08/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 07/08/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0725-03410
Permit Status: Inspections
Permit Description: Electric panel upgrade like for like 200 amps
| Date | Description | Comments |
|---|---|---|
| 07/08/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0725-03410
Permite Description: Electric panel upgrade like for like 200 amps
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2025 | RSEL - Electrical Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0725-03410
Permit Description: Electric panel upgrade like for like 200 amps
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2025 | BULD - Electrical Clearance | Passed | Approved 200A service panel upgrade - INCR Clearance was called into TEP at 1:10 pm | |
| 08/08/2025 | COT - RSEL - Electrical Final | Passed |