Permit: TC-RES-0725-03368
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
2010 N TUCSON BL UNIT A
Address NEW:
2010 N TUCSON BL UNIT A
Apply Date:
07/03/2025
Applicant:
Clay Beauchamp
Description:
Replace two 60-amp electrical panels serving a duplex property. The existing panels will be upgraded to 100-amp panels—one for each unit (Unit A and Unit B)
Permit Reviews
Permit Number - TC-RES-0725-03368
Permit Status: Inspections
Permit Description: Replace two 60-amp electrical panels serving a duplex property. The existing panels will be upgraded to 100-amp panels—one for each unit (Unit A and Unit B)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/07/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 07/07/2025 | REQUIRES RESUBMIT |
| 07/09/2025 | RESIDENTIAL SIMPLE REVIEW v.2 | 07/09/2025 | REQUIRES RESUBMIT |
| 07/09/2025 | RESIDENTIAL SIMPLE REVIEW v.3 | 07/09/2025 | APPROVED |
| 07/09/2025 | RESTAMP - RESIDENTIAL v.1 | 07/09/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0725-03368
Permit Status: Inspections
Permit Description: Replace two 60-amp electrical panels serving a duplex property. The existing panels will be upgraded to 100-amp panels—one for each unit (Unit A and Unit B)
| Date | Description | Comments |
|---|---|---|
| 07/07/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0725-03368
Permit Description: Replace two 60-amp electrical panels serving a duplex property. The existing panels will be upgraded to 100-amp panels—one for each unit (Unit A and Unit B)
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2025 | BULD - Electrical Clearance | Passed | Approved 100A service panel upgrade - INCR Clearance was called into TEP "after hours" at 4:05 pm for unit #A Pending final |
|
| 08/28/2025 | RSEL - Electrical Progress | Passed | ||
| 08/28/2025 | COT - RSEL - Electrical Final | Passed | 8.28.25 Approved |