Permit: TC-RES-0724-04419
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4848 E CALLE JABALI
Address NEW:
4848 E CALLE JABALI
Apply Date:
07/29/2024
Applicant:
alex enoch
Description:
Laundry and Bathroom Addition
Permit Reviews
Permit Number - TC-RES-0724-04419
Permit Status: Complete
Permit Description: Laundry and Bathroom Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/30/2024 | RESIDENTIAL NEW DWELLING v.1 | 09/03/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-RES-0724-04419
Permit Status: Complete
Permit Description: Laundry and Bathroom Addition
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/05/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-RES-0724-04419
Permit Status: Complete
Permit Description: Laundry and Bathroom Addition
| Date | Description | Comments |
|---|---|---|
| 09/03/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0724-04419
Permit Description: Laundry and Bathroom Addition
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/08/2024 | COT - RSPL - Rough Soil | Passed | OK to cover progress area. | |
| 12/27/2024 | COT - RSBU - Preslab | Passed | 1-Plans call for rebar in slab not WWM. 2-Plans call for radiant floor heating, which is not installed either. 12/27/24 contractor has a letter from the engineer stating that radiant flooring is optional, and that WWB may be used instead of rebar. PASS. |
|
| 12/27/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 1-Plans call for rebar in slab not WWM. 2-Plans call for radiant floor heating, which is not installed either. 12/27/24 contractor has a letter from the engineer stating that radiant flooring is optional, and that WWB may be used instead of rebar. PASS. |
|
| 01/17/2025 | COT - RSBU - Masonry Pregrout | Passed | ||
| 02/19/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 03/24/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 01/13/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 01/13/2026 | COT - RSME - Mechanical Final | Passed | ||
| 01/13/2026 | COT - RSEL - Electrical Final | Passed | ||
| 01/13/2026 | RSBU - Building Final | Passed |