Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
4848 E CALLE JABALI
Apply Date:
07/29/2024
Applicant:
alex enoch
Description:
Laundry and Bathroom Addition

Permit Reviews

Permit Number - TC-RES-0724-04419
Permit Status: Complete
Permit Description: Laundry and Bathroom Addition
Start Date Submittal Complete Date Status  
07/30/2024 RESIDENTIAL NEW DWELLING v.1 09/03/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-0724-04419
Permit Status: Complete
Permit Description: Laundry and Bathroom Addition
Total Outstanding Activity Conditions - 1
Date Name
08/05/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-RES-0724-04419
Permit Status: Complete
Permit Description: Laundry and Bathroom Addition
Date Description Comments
09/03/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0724-04419
Permit Description: Laundry and Bathroom Addition
Total Completed Inspections - 10
Date Description Inspector Results Comments
11/08/2024 COT - RSPL - Rough Soil Passed OK to cover progress area.
12/27/2024 COT - RSBU - Preslab Passed 1-Plans call for rebar in slab not WWM. 2-Plans call for radiant floor heating, which is not installed either.

12/27/24 contractor has a letter from the engineer stating that radiant flooring is optional, and that WWB may be used instead of rebar. PASS.
12/27/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 1-Plans call for rebar in slab not WWM. 2-Plans call for radiant floor heating, which is not installed either.

12/27/24 contractor has a letter from the engineer stating that radiant flooring is optional, and that WWB may be used instead of rebar. PASS.
01/17/2025 COT - RSBU - Masonry Pregrout Passed
02/19/2025 COT - RSBU - Roof Nailing Passed
03/24/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/13/2026 COT - RSPL - Plumbing Final Passed
01/13/2026 COT - RSME - Mechanical Final Passed
01/13/2026 COT - RSEL - Electrical Final Passed
01/13/2026 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
4848 E. CALLE JABALI - WAITS RESIDENCE-PDF_V1.PDF DOCUMENTS VIEW
CONS-PLAN SET V1_V1.PDF DOCUMENTS VIEW