Permit: TC-RES-0724-04394
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3968 E LOUIS LN
Address NEW:
3968 E LOUIS LN
Apply Date:
07/29/2024
Applicant:
David Tannous
Description:
ADU
Permit Reviews
Permit Number - TC-RES-0724-04394
Permit Status: Complete
Permit Description: ADU
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/28/2025 | RESIDENTIAL NEW DWELLING REVISION v.1 | 01/28/2025 | APPROVED |
| 10/11/2024 | RESIDENTIAL NEW DWELLING v.4 | 10/11/2024 | REQUIRES RESUBMIT |
| 04/29/2025 | RESIDENTIAL ADU REVISION v.2 | 05/16/2025 | APPROVED |
| 11/26/2024 | RESIDENTIAL NEW DWELLING v.6 | 12/23/2024 | APPROVED |
| 10/14/2024 | RESIDENTIAL NEW DWELLING v.5 | 11/20/2024 | REQUIRES RESUBMIT |
| 08/15/2024 | RESIDENTIAL NEW DWELLING v.3 | 09/16/2024 | REQUIRES RESUBMIT |
| 07/29/2024 | RESIDENTIAL NEW DWELLING v.1 | 07/29/2024 | REQUIRES RESUBMIT |
| 03/13/2025 | RESIDENTIAL ADU REVISION v.1 | 04/16/2025 | REQUIRES RESUBMIT |
| 12/23/2024 | RESTAMP - RESIDENTIAL v.1 | 12/23/2024 | APPROVED |
| 08/15/2024 | RESIDENTIAL NEW DWELLING v.2 | 08/15/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0724-04394
Permit Status: Complete
Permit Description: ADU
| Date | Description | Comments |
|---|---|---|
| 07/29/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 11/26/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0724-04394
Permite Description: ADU
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2025 | COT - RSEL - Electrical Underground | N/A | Re-inspection required | Observed 1-1/2 rigid conduit approx 18" below proposed building; this does not match approved plans from Architect. Proceed at own risk. |
| 06/06/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | Need HVAC roughed in and associated wiring; OK to proceed elsewhere. |
| 08/08/2025 | BULD - Electrical Clearance | N/A | Not Applicable | duplicate |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0724-04394
Permit Description: ADU
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 03/28/2025 | COT - RSPL - Rough Soil | Passed | Plumbing per plan, ok to backfill 3/28/25 | |
| 04/07/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar per plans 4/7/25 | |
| 04/08/2025 | COT - RSBU - Preslab and floodplain | Passed | ||
| 05/20/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 05/21/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 05/21/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 06/10/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/27/2025 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 07/24/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/08/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 08/08/2025 | COT - RSME - Mechanical Final | Passed | ||
| 08/08/2025 | COT - RSEL - Electrical Final | Passed | ||
| 08/14/2025 | RSBU - Building Final | Passed |