Permit: TC-RES-0724-04318
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
6242 S LOGGER DR
Address NEW:
6242 S LOGGER DR
Apply Date:
07/24/2024
Applicant:
Adonis Bravo
Description:
Roof mounted 7,600kwh AC solar system
Permit Reviews
Permit Number - TC-RES-0724-04318
Permit Status: Complete
Permit Description: Roof mounted 7,600kwh AC solar system
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/09/2024 | RESIDENTIAL SOLAR v.2 | 09/10/2024 | REQUIRES RESUBMIT |
| 09/24/2024 | RESIDENTIAL SOLAR v.3 | 09/27/2024 | APPROVED |
| 07/25/2024 | RESIDENTIAL SOLAR v.1 | 08/27/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0724-04318
Permit Status: Complete
Permit Description: Roof mounted 7,600kwh AC solar system
| Date | Description | Comments |
|---|---|---|
| 11/05/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 09/27/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0724-04318
Permit Description: Roof mounted 7,600kwh AC solar system
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2025 | RSBU - Building Final | Passed | ||
| 07/07/2025 | BULD - Electrical Clearance | Passed | Clearance for TEP DGC. 7/7/2025 | |
| 07/07/2025 | COT - RSOL - Electrical Final Solar Project | Passed |