Permit: TC-RES-0724-04285
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
7575 E LOGAN DR
Address NEW:
7575 E LOGAN DR
Apply Date:
07/23/2024
Applicant:
Steven Carlson
Description:
71.67 L/F of 20"-24" tall 8x8x16 retaining wall with 6' tall 6x8x16 block wall on top. 17 L/F of 12"-16" 8x8x16 retaining wall with 6' tall 6x8x16 block wall on top.
Permit Reviews
Permit Number - TC-RES-0724-04285
Permit Status: Issued
Permit Description: 71.67 L/F of 20"-24" tall 8x8x16 retaining wall with 6' tall 6x8x16 block wall on top.
17 L/F of 12"-16" 8x8x16 retaining wall with 6' tall 6x8x16 block wall on top.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/24/2024 | RESIDENTIAL FENCE/WALL v.1 | 08/08/2024 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0724-04285
Permite Description: 71.67 L/F of 20"-24" tall 8x8x16 retaining wall with 6' tall 6x8x16 block wall on top.
17 L/F of 12"-16" 8x8x16 retaining wall with 6' tall 6x8x16 block wall on top.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2024 | COT - RSBU - Masonry Pregrout | N/A | Partial Pass | This wall appears to be mostly constructed with 24 too 42 inch retaining wall (including the footer) plus 6 feet 4 inches to site wall on top of the retaining wall. |
| 08/23/2024 | RSBU - Building Final | N/A | Partial Pass | This wall appears to be mostly constructed with 24 too 42 inch retaining wall (including the footer) plus 6 feet 4 inches to site wall on top of the retaining wall. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0724-04285
Permit Description: 71.67 L/F of 20"-24" tall 8x8x16 retaining wall with 6' tall 6x8x16 block wall on top.
17 L/F of 12"-16" 8x8x16 retaining wall with 6' tall 6x8x16 block wall on top.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | The Longitudinal bar for the footer is in place at this time. The vertical bars are laying against a slope on the inside of the wall and will be placed. Once the concrete has been poured for the footer photographs of the finished product. Will be set to my phone tomorrow morning once all the work has been completed. |