Permit: TC-RES-0724-04139
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
12809 E TORTOISE CANYON LN
Address NEW:
12809 E TORTOISE CANYON LN
Apply Date:
07/16/2024
Applicant:
Albert Montoya
Description:
New Pool Build
Permit Reviews
Permit Number - TC-RES-0724-04139
Permit Status: Complete
Permit Description: New Pool Build
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/17/2024 | RESIDENTIAL POOL v.1 | 08/05/2024 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0724-04139
Permit Description: New Pool Build
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/07/2024 | Pool/Spa - Bonding Grip | Passed | bond wire is around pool and connected to rebar reinforcement. | |
| 10/07/2024 | Pool/Spa - Pre-Gunite | Passed | All rebar reinforcement is in place and supported off of soil. Bond wire is ran around pool edge and properly connected to rebar reinforcement. | |
| 10/07/2024 | RSEL - Electrical Progress | Passed | Rough-in of electrical conduits for pool lighting and control panel is complete. Okay to shade conduit and backfill trench. | |
| 10/22/2024 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. Pool equipment. 10/22/2024 | |
| 10/22/2024 | Pool/Spa - Electric | Passed | ||
| 10/22/2024 | Pool/Spa - Plumbing | Passed | gas plumbing line approved. on test and proper depth. okay to backfill. shading required. 10/22/2024 | |
| 11/06/2024 | COT - RSEL - Electrical Final | Passed | Electrical for pool control box and equipment is operational. | |
| 11/06/2024 | Pool/Spa - Final/Barrier | Passed | Gate is spring hinged and self latching. Dmoors and windows are alarmed. | |
| 11/06/2024 | RSBU - Building Final | Passed | Electrical for pool control box and equipment is operational. Pool is complete. Okay to pebble tech coat bottom and sides of pool. |