Permit: TC-RES-0724-04124
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2833 E ARROYO CHICO
Address NEW:
2833 E ARROYO CHICO
Apply Date:
07/15/2024
Applicant:
TFS Solar
Description:
Reconfigure existing Energy Storage System (ESS) from whole-house backup to partial-house backup. Remove Tesla backup switch & reroute circuits. Power kill required. REV1: Remove Microinverters from existing AC modules. Add modules as DC strings to Powerwall 3. Tesla Backup Switch to remain.
Permit Reviews
Permit Number - TC-RES-0724-04124
Permit Status: Complete
Permit Description: Reconfigure existing Energy Storage System (ESS) from whole-house backup to partial-house backup. Remove Tesla backup switch & reroute circuits. Power kill required. REV1: Remove Microinverters from existing AC modules. Add modules as DC strings to Powerwall 3. Tesla Backup Switch to remain.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/15/2024 | RESIDENTIAL SIMPLE REVIEW v.1 | 07/15/2024 | APPROVED |
| 08/16/2024 | RESIDENTIAL SIMPLE REVIEW REVISION v.1 | 08/16/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0724-04124
Permite Description: Reconfigure existing Energy Storage System (ESS) from whole-house backup to partial-house backup. Remove Tesla backup switch & reroute circuits. Power kill required. REV1: Remove Microinverters from existing AC modules. Add modules as DC strings to Powerwall 3. Tesla Backup Switch to remain.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2024 | RSEL - Electrical Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0724-04124
Permit Description: Reconfigure existing Energy Storage System (ESS) from whole-house backup to partial-house backup. Remove Tesla backup switch & reroute circuits. Power kill required. REV1: Remove Microinverters from existing AC modules. Add modules as DC strings to Powerwall 3. Tesla Backup Switch to remain.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2024 | COT - RSEL - Electrical Final | Passed | Approved solar and battery installation - DGC/BAT Clearance to TEP is required | |
| 09/03/2024 | BULD - Electrical Clearance | Passed | Approved solar and battery installation - DGC/BAT Clearance to TEP is required |