Permit: TC-RES-0724-04076
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2131 N COLTER DR
Address NEW:
2131 N COLTER DR
Apply Date:
07/11/2024
Applicant:
James Voss
Description:
Interior Bathroom Renovation
Permit Reviews
Permit Number - TC-RES-0724-04076
Permit Status: Complete
Permit Description: Interior Bathroom Renovation
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/12/2024 | RESIDENTIAL NEW DWELLING v.1 | 08/14/2024 | APPROVED |
Conditions
Permit Number - TC-RES-0724-04076
Permit Status: Complete
Permit Description: Interior Bathroom Renovation
| Date | Description | Comments |
|---|---|---|
| 08/15/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 08/14/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0724-04076
Permite Description: Interior Bathroom Renovation
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2024 | COT - RSME - Mechanical Final | N/A | Not Ready | wanted intermediate. |
| 12/12/2024 | COT - RSPL - Plumbing Final | N/A | Not Ready | wanted intermediate. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0724-04076
Permit Description: Interior Bathroom Renovation
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/07/2024 | COT - RSBU - Preslab | Passed | 10/7/24: okay to place concrete in bathroom area all plumbing fixtures have foam wrap | |
| 10/07/2024 | COT - RSPL - Rough Soil | Passed | 10/7/24: okay to backfill plumbing | |
| 12/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 04/22/2025 | COT - RSME - Mechanical Final | Passed | Passed final 4/22/25 | |
| 04/22/2025 | RSBU - Building Final | Passed | Passed final 4/22/25 | |
| 04/22/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 4/22/25 | |
| 04/22/2025 | COT - RSEL - Electrical Final | Passed | Passed final 4/22/25 |