Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
826 W CALLE RETAMA
Apply Date:
07/10/2024
Applicant:
Anthony Duplantis
Description:
Install 35 roof mounted PV panels, 14.35 kW REV1: Revised as-built-plans to show changes made to the layout. REV2: Derate the main breaker to 150 amps to facilitate the 70 amp interconnection

Permit Reviews

Permit Number - TC-RES-0724-04032
Permit Status: Complete
Permit Description: Install 35 roof mounted PV panels, 14.35 kW REV1: Revised as-built-plans to show changes made to the layout. REV2: Derate the main breaker to 150 amps to facilitate the 70 amp interconnection
Start Date Submittal Complete Date Status  
12/16/2024 RESIDENTIAL SOLAR v.1 01/02/2025 APPROVED Review Details
06/24/2025 RESIDENTIAL SOLAR REVISION v.2 07/03/2025 APPROVED Review Details
11/26/2024 RESIDENTIAL SOLAR v.2 11/26/2024 REQUIRES RESUBMIT Review Details
07/10/2024 RESIDENTIAL SOLAR v.1 08/09/2024 REQUIRES RESUBMIT Review Details
12/02/2024 RESIDENTIAL SOLAR v.3 12/04/2024 APPROVED Review Details
01/09/2025 RESIDENTIAL SOLAR REVISION v.1 01/23/2025 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0724-04032
Permite Description: Install 35 roof mounted PV panels, 14.35 kW REV1: Revised as-built-plans to show changes made to the layout. REV2: Derate the main breaker to 150 amps to facilitate the 70 amp interconnection
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/07/2025 RSBU - Building Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0724-04032
Permit Description: Install 35 roof mounted PV panels, 14.35 kW REV1: Revised as-built-plans to show changes made to the layout. REV2: Derate the main breaker to 150 amps to facilitate the 70 amp interconnection
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/17/2025 RSBU - Building Final Passed Approved solar and battery with 150A derate - DGC/BAT Clearance to TEP is required for the solar meter
07/17/2025 COT - RSOL - Electrical Final Solar Project Passed
07/17/2025 BULD - Electrical Clearance Passed Approved solar and battery with 150A derate - DGC/BAT Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-DIAZ - 826 W CALLE RETAMA ENGINEERING 12-13-24_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-DIAZ - 826 W CALLE RETAMA ENGINEERING 11-20-24_V3.PDF DOCUMENTS VIEW